IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

864

matching recommendations
Reset
SIC 3085 Plastics Bottles
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0185 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,276 $1,250 Implemented
TT0185 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,670 $10,600 Not Implemented
TT0185 # 05 Y:2017 05 2017 APPLY FOR INVESTMENT INCENTIVES $2,174 $40 Implemented
TT0185 # 06 Y:2017 06 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,425 $1,425 Implemented
AM0724 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $12,300 $16,500 Not Implemented
AM0724 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,720 $0 Implemented
AM0724 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $4,040 $1,010 Not Implemented
AM0724 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,040 $4,690 Implemented
AM0724 # 05 Y:2017 05 2017 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,020 $0 Implemented
AM0724 # 06 Y:2017 06 2017 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,370 $2,000 Not Implemented
AM0724 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $235 $200 Implemented
AM0724 # 08 Y:2017 08 2017 INSULATE BARE EQUIPMENT $126 $210 Implemented
OK0938 # 01 Y:2016 01 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $34,651 $40,660 Not Implemented
OK0938 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,405 $59,664 Implemented
OK0938 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $16,558 $4,930 Not Implemented
OK0938 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,124 $3,000 Not Implemented
OK0938 # 05 Y:2016 05 2016 INSTALL SET-BACK TIMERS $317 $344 Implemented
OK0938 # 06 Y:2016 06 2016 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $5,044 $44,525 Not Implemented
OK0938 # 07 Y:2016 07 2016 INSULATE BARE EQUIPMENT $4,491 $2,935 Not Implemented
OK0938 # 08 Y:2016 08 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,294 $5,000 Not Implemented
OK0938 # 09 Y:2016 09 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,693 $3,236 Implemented
OK0938 # 10 Y:2016 10 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $372,611 $70,000 Not Implemented
OK0938 # 11 Y:2016 11 2016 OPTIMIZE PLANT POWER FACTOR $26,300 $47,542 Implemented
OK0938 # 12 Y:2016 12 2016 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $308,836 $1,371,615 Not Implemented
WM0083 # 01 Y:2016 01 2016 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $61,468 $22,995 Not Implemented