IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 3085 Plastics Bottles
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0543 # 07 Y:2003 07 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,408 $527 Implemented
MA0543 # 06 Y:2003 06 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,571 $12,104 Implemented
MA0543 # 05 Y:2003 05 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,953 $12,400 Not Implemented
MA0543 # 04 Y:2003 04 2003 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $5,292 $0 Not Implemented
MA0543 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,265 $0 Not Implemented
MA0543 # 02 Y:2003 02 2003 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $26,717 $40,000 Not Implemented
MA0543 # 01 Y:2003 01 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,705 $21,900 n/a
GT0748 # 02 Y:2003 02 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $44,604 $85,000 n/a
GT0748 # 07 Y:2003 07 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $22,400 $22,800 n/a
GT0748 # 06 Y:2003 06 2003 USE OPTIMUM TEMPERATURE $76,382 $16,640 n/a
GT0748 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,272 $17,760 n/a
GT0748 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,314 $2,844 n/a
GT0748 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $28,809 $0 n/a
GT0748 # 01 Y:2003 01 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $116,954 $2,000 n/a
GT0748 # 08 Y:2003 08 2003 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $810,975 $4,250,000 n/a
MS0231 # 11 Y:2003 11 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $120 $10 Implemented
MS0231 # 10 Y:2003 10 2003 INSTALL TIMERS AND/OR THERMOSTATS $152 $119 Implemented
MS0231 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $995 $2,905 Not Implemented
MS0231 # 08 Y:2003 08 2003 USE RADIANT HEATER FOR SPOT HEATING $3,584 $3,456 Implemented
MS0231 # 07 Y:2003 07 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,254 $8,386 Not Implemented
MS0231 # 06 Y:2003 06 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,964 $3,200 Not Implemented
MS0231 # 05 Y:2003 05 2003 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,811 $11,139 Not Implemented
MS0231 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $15,508 $26,644 Not Implemented
MS0231 # 03 Y:2003 03 2003 USE SYNTHETIC LUBRICANT $13,851 $7,500 Not Implemented
MS0231 # 02 Y:2003 02 2003 PREHEAT COMBUSTION AIR WITH WASTE HEAT $30,273 $4,486 Not Implemented