Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsSIC | 3085 | Plastics Bottles |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0412 # 09 Y:2010 | 09 | 2010 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $91,232 | $255,000 | Not Implemented |
NC0412 # 08 Y:2010 | 08 | 2010 | ADVERTISE PRODUCT OR SERVICE | $1,000,000 | $2,000,000 | Not Implemented |
NC0412 # 07 Y:2010 | 07 | 2010 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,402 | $1,200 | Implemented |
NC0412 # 06 Y:2010 | 06 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,349 | $13,200 | Not Implemented |
NC0412 # 05 Y:2010 | 05 | 2010 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $7,153 | $15,100 | Implemented |
NC0412 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $140,256 | $442,314 | Implemented |
NC0412 # 02 Y:2010 | 02 | 2010 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $25,289 | $50 | Implemented |
NC0412 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,233 | $100 | Implemented |
NC0412 # 04 Y:2010 | 04 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $2,841 | $4,995 | Implemented |
GT0873 # 02 Y:2010 | 02 | 2010 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $10,144 | $4,600 | Not Implemented |
GT0873 # 06 Y:2010 | 06 | 2010 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $11,661 | $775 | Implemented |
GT0873 # 05 Y:2010 | 05 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $816 | $4,400 | Implemented |
GT0873 # 04 Y:2010 | 04 | 2010 | INSTALL OCCUPANCY SENSORS | $3,777 | $10,640 | Implemented |
GT0873 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,825 | $19,768 | Not Implemented |
GT0873 # 01 Y:2010 | 01 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,353 | $0 | Implemented |
TT0049 # 01 Y:2010 | 01 | 2010 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $5,280 | $9,600 | Not Implemented |
TT0049 # 02 Y:2010 | 02 | 2010 | REPAIR OR REPLACE STEAM TRAPS | $9,803 | $4,000 | Not Implemented |
TT0049 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,257 | $50 | Not Implemented |
TT0049 # 04 Y:2010 | 04 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $16,200 | $18,200 | Not Implemented |
TT0049 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,756 | $173,505 | Implemented |
TT0049 # 06 Y:2010 | 06 | 2010 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $10,723 | $0 | Not Implemented |