IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 3086 Plastics Foam Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0940 # 12 Y:2016 12 2016 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,892 $5,000 Implemented
UD0940 # 11 Y:2016 11 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,440 $2,275 Not Implemented
UD0940 # 10 Y:2016 10 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,879 $3,100 Not Implemented
UD0940 # 09 Y:2016 09 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $920 $1,000 Implemented
UD0940 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,111 $29 Implemented
UD0940 # 07 Y:2016 07 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,236 $5,400 Not Implemented
UD0940 # 06 Y:2016 06 2016 RECOVER WASTE HEAT FROM EQUIPMENT $2,717 $1,500 Implemented
UD0940 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $4,195 $1,683 Not Implemented
UD0940 # 04 Y:2016 04 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,308 $0 Implemented
UD0940 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $15,056 $750 Not Implemented
UD0940 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,203 $0 Implemented
UD0940 # 01 Y:2016 01 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,751 $0 Implemented
UM0379 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,353 $14,633 Implemented
UM0379 # 02 Y:2010 02 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,706 $2,000 Implemented
UM0379 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,989 $1,350 Implemented
UM0379 # 03 Y:2010 03 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $229 $10 Implemented
UM0379 # 05 Y:2010 05 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $7,283 $9,861 Implemented
UM0379 # 04 Y:2010 04 2010 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $9,060 $1,500 Implemented
UD0606 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $922 $1,430 Not Implemented
UD0606 # 05 Y:2000 05 2000 INSULATE BARE EQUIPMENT $2,029 $785 Not Implemented
UD0606 # 04 Y:2000 04 2000 INSTALL EQUIPMENT TO MOVE PRODUCT $35,984 $135,000 Not Implemented
UD0606 # 03 Y:2000 03 2000 ELIMINATE/REDUCE AN OPERATION $41,983 $75,000 Not Implemented
UD0606 # 02 Y:2000 02 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $74,616 $0 Implemented
UD0606 # 01 Y:2000 01 2000 INCREASE USE OF AUTOMATION $50,319 $12,000 Implemented
UD0567 # 05 Y:1999 05 1999 UPGRADE CONTROLS ON COMPRESSORS $7,855 $2,508 Implemented