IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

929

matching recommendations
Reset
SIC 3086 Plastics Foam Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0250 # 09 Y:2013 09 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,490 $2,460 Not Implemented
MI0250 # 10 Y:2013 10 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,327 $4,510 Not Implemented
MI0250 # 11 Y:2013 11 2013 INSTALL OCCUPANCY SENSORS $449 $330 Not Implemented
WM0029 # 01 Y:2013 01 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,132 $3,066 Not Implemented
WM0029 # 02 Y:2013 02 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,542 $1,240 Implemented
WM0029 # 03 Y:2013 03 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,494 $2,200 Not Implemented
WM0029 # 04 Y:2013 04 2013 USE SYNTHETIC LUBRICANT $23,138 $22,800 Not Implemented
WM0029 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $9,925 $4,915 Implemented
WM0029 # 07 Y:2013 07 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $797 $2,276 Not Implemented
WM0029 # 10 Y:2013 10 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,633 $644 Implemented
WM0029 # 09 Y:2013 09 2013 REDUCE FLUID FLOW RATES $434 $2,085 Not Implemented
WM0029 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $149 $520 Not Implemented
WM0029 # 06 Y:2013 06 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $27,541 $70,000 Not Implemented
MZ0108 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,938 $0 Not Implemented
MZ0108 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $4,161 $4,018 Not Implemented
MZ0108 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,978 $1,256 Not Implemented
MZ0108 # 04 Y:2013 04 2013 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,074 $10,000 Not Implemented
MZ0108 # 05 Y:2013 05 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,196 $3,512 Not Implemented
MZ0108 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,354 $1,090 Implemented
MZ0108 # 07 Y:2013 07 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $423 $360 Not Implemented
MZ0108 # 08 Y:2013 08 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $342 $200 Not Implemented
MZ0108 # 09 Y:2013 09 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $119 $32 Implemented
SD0467 # 01 Y:2013 01 2013 REDUCE SCRAP PRODUCTION $24,055 $56,924 Implemented
SD0467 # 02 Y:2013 02 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,483 $12,710 Implemented
SD0467 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,612 $500 Implemented