Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
929
matching recommendationsSIC | 3086 | Plastics Foam Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0172 # 07 Y:1996 | 07 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $29,903 | $34,100 | Implemented |
AS0172 # 08 Y:1996 | 08 | 1996 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $30,874 | $38,200 | Not Implemented |
AS0172 # 09 Y:1996 | 09 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $12,620 | $8,092 | Not Implemented |
AS0172 # 10 Y:1996 | 10 | 1996 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $5,393 | $0 | Not Implemented |
NV0055 # 01 Y:1996 | 01 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $86 | $63 | Not Implemented |
NV0055 # 02 Y:1996 | 02 | 1996 | USE POWER DURING OFF-PEAK PERIODS | $3,340 | $0 | Not Implemented |
NV0055 # 03 Y:1996 | 03 | 1996 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,239 | $200 | Implemented |
NV0055 # 04 Y:1996 | 04 | 1996 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,970 | $1,600 | Not Implemented |
NV0055 # 05 Y:1996 | 05 | 1996 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $480 | $0 | Not Implemented |
NV0055 # 06 Y:1996 | 06 | 1996 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,395 | $4,000 | Not Implemented |
NV0055 # 07 Y:1996 | 07 | 1996 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $4,080 | $8,170 | Not Implemented |
HO0130 # 01 Y:1996 | 01 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,898 | $27,392 | Implemented |
HO0130 # 02 Y:1996 | 02 | 1996 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $20,894 | $19,210 | Implemented |
HO0130 # 03 Y:1996 | 03 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $179,887 | $800,000 | Not Implemented |
HO0130 # 04 Y:1996 | 04 | 1996 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $18,091 | $22,000 | Not Implemented |
HO0130 # 05 Y:1996 | 05 | 1996 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $35,718 | $5,590 | Implemented |
HO0130 # 06 Y:1996 | 06 | 1996 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $196,000 | $50,000 | Not Implemented |
HO0130 # 07 Y:1996 | 07 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $19,642 | $14,400 | Not Implemented |
HO0130 # 08 Y:1996 | 08 | 1996 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $507 | $930 | Not Implemented |
HO0130 # 09 Y:1996 | 09 | 1996 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $63,000 | $56,700 | Implemented |
HO0130 # 10 Y:1996 | 10 | 1996 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $130,320 | $186,569 | Not Implemented |
HO0130 # 11 Y:1996 | 11 | 1996 | INCREASE USE OF AUTOMATION | $65,363 | $26,200 | Implemented |
AR0079 # 01 Y:1996 | 01 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $889 | $263 | Not Implemented |
AR0079 # 02 Y:1996 | 02 | 1996 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,954 | $1,960 | Not Implemented |
AR0079 # 03 Y:1996 | 03 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,788 | $100 | Implemented |