IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

929

matching recommendations
Reset
SIC 3086 Plastics Foam Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0040 # 06 Y:1995 06 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,678 $6,060 Not Implemented
UM0038 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,000 $2,200 Not Implemented
UM0038 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,479 $20,838 Not Implemented
UM0038 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $421 $1,500 Not Implemented
UM0038 # 04 Y:1995 04 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,796 $1,000 Not Implemented
UM0038 # 05 Y:1995 05 1995 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,447 $4,400 Not Implemented
UM0038 # 06 Y:1995 06 1995 USE RADIANT HEATER FOR SPOT HEATING $2,270 $6,800 Not Implemented
ME0170 # 01 Y:1995 01 1995 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $23,325 $55,000 Implemented
ME0170 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $15,977 $6,730 Implemented
ME0170 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,002 $8,064 Not Implemented
ME0170 # 04 Y:1995 04 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,232 $8,000 Not Implemented
ME0170 # 05 Y:1995 05 1995 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,200 $0 Implemented
ME0170 # 06 Y:1995 06 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,736 $5,000 Not Implemented
ME0170 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $290 $200 Implemented
ME0170 # 08 Y:1995 08 1995 MINIMIZE WATER USAGE $849 $110 Implemented
SD0128 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,844 $2,200 Implemented
SD0128 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $358 $20 Implemented
SD0128 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,738 $2,595 Implemented
SD0128 # 04 Y:1995 04 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $13,201 $10,820 Implemented
SD0128 # 05 Y:1995 05 1995 INSTALL OCCUPANCY SENSORS $533 $607 Implemented
NC0057 # 01 Y:1995 01 1995 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $7,069 $0 Implemented
NC0057 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $142 $180 Implemented
NC0057 # 03 Y:1995 03 1995 INSULATE BARE EQUIPMENT $415 $250 Not Implemented
NC0057 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $680 $984 Not Implemented
NC0057 # 05 Y:1995 05 1995 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $9,881 $10,000 Not Implemented