IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 3086 Plastics Foam Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0428 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $681 $100 Implemented
NC0428 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,910 $25 Implemented
NC0428 # 06 Y:2011 06 2011 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $7,730 $47,000 Not Implemented
NC0428 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $307 $750 Implemented
NC0428 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,540 $13,050 Implemented
NC0428 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $72,294 $287,294 Implemented
NC0428 # 02 Y:2011 02 2011 IMPROVE SPACE COMFORT CONDITIONING $60,444 $94,425 Not Implemented
NC0428 # 01 Y:2011 01 2011 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $145,527 $450,915 Implemented
NC0253 # 01 Y:2003 01 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $81,956 $105,000 n/a
NC0253 # 05 Y:2003 05 2003 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $5,046 $2,000 Not Implemented
NC0253 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $130 $48 Not Implemented
NC0253 # 03 Y:2003 03 2003 AVOID REWINDING MOTORS MORE THAN TWICE $694 $432 Not Implemented
NC0253 # 02 Y:2003 02 2003 ADJUST BURNERS FOR EFFICIENT OPERATION $3,127 $1,000 Not Implemented
NC0109 # 07 Y:1997 07 1997 EXPAND OPERATIONS INTO UNUSED SPACE $3,436,000 $2,250,000 Not Implemented
NC0109 # 06 Y:1997 06 1997 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $9,315 $30,000 Not Implemented
NC0109 # 05 Y:1997 05 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,281 $1,200 Implemented
NC0109 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $210 $402 Implemented
NC0109 # 03 Y:1997 03 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,246 $0 Not Implemented
NC0109 # 02 Y:1997 02 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,491 $650 Not Implemented
NC0109 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,734 $630 Implemented
NC0057 # 01 Y:1995 01 1995 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $7,069 $0 Implemented
NC0057 # 05 Y:1995 05 1995 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $9,881 $10,000 Not Implemented
NC0057 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $680 $984 Not Implemented
NC0057 # 03 Y:1995 03 1995 INSULATE BARE EQUIPMENT $415 $250 Not Implemented
NC0057 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $142 $180 Implemented