IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

360

matching recommendations
Reset
SIC 3087 Custom Compound Purchased Resins
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0795 # 05 Y:2009 05 2009 UPGRADE CONTROLS ON COMPRESSORS $2,905 $500 Implemented
UD0795 # 06 Y:2009 06 2009 INSULATE BARE EQUIPMENT $2,125 $300 Not Implemented
UD0795 # 07 Y:2009 07 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,002 $10,000 Not Implemented
UD0795 # 08 Y:2009 08 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,781 $0 Implemented
UD0795 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,807 $2,958 Not Implemented
UD0795 # 10 Y:2009 10 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,251 $3,537 Not Implemented
UD0795 # 11 Y:2009 11 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $554 $0 Not Implemented
UD0795 # 12 Y:2009 12 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $481 $200 Not Implemented
UD0795 # 13 Y:2009 13 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $768 $0 Implemented
AM0547 # 01 Y:2008 01 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $65,750 $20,000 Not Implemented
AM0547 # 02 Y:2008 02 2008 OPTIMIZE PLANT POWER FACTOR $27,000 $28,900 Not Implemented
AM0547 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,020 $22,260 Not Implemented
AM0547 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,600 $700 Not Implemented
AM0547 # 05 Y:2008 05 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $7,000 $0 Not Implemented
AM0547 # 06 Y:2008 06 2008 USE SYNTHETIC LUBRICANT $4,300 $0 Not Implemented
AM0547 # 07 Y:2008 07 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,150 $500 Not Implemented
AM0547 # 08 Y:2008 08 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $170 $390 Not Implemented
LE0264 # 01 Y:2007 01 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $25,680 $50,000 Implemented
LE0264 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,103 $2,500 Implemented
LE0264 # 03 Y:2007 03 2007 INSTALL TIMERS AND/OR THERMOSTATS $4,204 $2,000 Implemented
LE0264 # 04 Y:2007 04 2007 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $4,727 $2,250 Not Implemented
LE0264 # 05 Y:2007 05 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,084 $500 Implemented
LE0264 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,514 $200 Not Implemented
LE0264 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,184 $2,500 Implemented
LE0264 # 08 Y:2007 08 2007 USE SYNTHETIC LUBRICANT $3,151 $500 Not Implemented