IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

243

matching recommendations
Reset
SIC 3088 Plastics Plumbing Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0358 # 08 Y:2005 08 2005 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $37,125 $52,500 Implemented
SD0357 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $416,473 $750,000 Implemented
SD0357 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,472 $10,980 Not Implemented
SD0357 # 03 Y:2005 03 2005 RECOVER AND REUSE WASTE MATERIAL $31,776 $50,000 Not Implemented
SD0357 # 04 Y:2005 04 2005 AUTOMATE FINISHING PROCESS $314,336 $500,000 Not Implemented
SD0357 # 05 Y:2005 05 2005 AUTOMATE FINISHING PROCESS $189,416 $450,000 Implemented
SD0357 # 06 Y:2005 06 2005 INSTALL SYSTEM TO COLLECT SCRAP $32,128 $29,639 Implemented
SU0187 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,725 $0 Not Implemented
SU0187 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,502 $350 Implemented
SU0187 # 03 Y:2004 03 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $513 $442 Not Implemented
SU0187 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $26,177 $53,000 Not Implemented
SU0187 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,721 $10,129 Implemented
SU0187 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $1,206 $3,817 Not Implemented
AS0321 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,476 $2,819 Not Implemented
AS0321 # 02 Y:2002 02 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $42,990 $2,700 Implemented
AS0321 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,666 $100 Implemented
AS0321 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $16,063 $4,370 Implemented
AS0321 # 05 Y:2002 05 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $4,394 $323 Implemented
SD0263 # 01 Y:2001 01 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,376 $20,000 Not Implemented
SD0263 # 02 Y:2001 02 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $1,258 $1,500 Implemented
SD0263 # 03 Y:2001 03 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,173 $4,000 Implemented
SD0263 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,402 $90 Implemented
SD0263 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,644 $9,576 Implemented
SD0263 # 06 Y:2001 06 2001 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,239 $4,250 Not Implemented
SD0263 # 07 Y:2001 07 2001 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $4,278 $0 Implemented