IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0459 # 09 Y:2012 09 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,834 $701 Implemented
WV0459 # 06 Y:2012 06 2012 DEVELOP A REPAIR/REPLACE POLICY $10,718 $2,889 Implemented
WV0459 # 05 Y:2012 05 2012 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $10,943 $1,000 Implemented
WV0459 # 08 Y:2012 08 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,895 $0 Implemented
WV0459 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,273 $90 Implemented
WV0459 # 11 Y:2012 11 2012 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,330 $90 Implemented
DL0074 # 02 Y:2011 02 2011 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $12,050 $4,500 Implemented
DL0074 # 03 Y:2011 03 2011 KEEP EQUIPMENT CLEAN $9,770 $2,000 Implemented
DL0074 # 07 Y:2011 07 2011 RECOVER WASTE HEAT FROM EQUIPMENT $3,320 $1,900 Implemented
DL0074 # 10 Y:2011 10 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $510 $1,300 Implemented
DL0074 # 01 Y:2011 01 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,390 $2,000 Implemented
WV0405 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,475 $4,751 Implemented
WV0405 # 02 Y:2010 02 2010 USE RADIANT HEATER FOR SPOT HEATING $8,114 $4,540 Implemented
WV0405 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,129 $42,755 Implemented
WV0405 # 04 Y:2010 04 2010 REDUCE VENTILATION AIR $1,892 $1,078 Implemented
WV0405 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,359 $588 Implemented
WV0405 # 08 Y:2010 08 2010 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $747 $1,000 Implemented
WV0405 # 10 Y:2010 10 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $367 $27 Implemented
WV0271 # 01 Y:2003 01 2003 INSULATE BARE EQUIPMENT $76,401 $2,253 Implemented
WV0271 # 02 Y:2003 02 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $27,875 $480 Implemented
WV0271 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,764 $128 Implemented
WV0271 # 09 Y:2003 09 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,425 $250 Implemented
WV0271 # 10 Y:2003 10 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,758 $0 Implemented
WV0271 # 11 Y:2003 11 2003 INSTALL OCCUPANCY SENSORS $839 $800 Implemented
WV0271 # 13 Y:2003 13 2003 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $160 $32 Implemented