IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0329 # 07 Y:2003 07 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $23 $42 Implemented
IA0329 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,437 $22 Implemented
IA0329 # 02 Y:2003 02 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,024 $250 Implemented
IA0329 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,170 $533 Implemented
IA0329 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $797 $1,198 Implemented
DS0175 # 04 Y:2000 04 2000 INSTALL TIMERS AND/OR THERMOSTATS $2,005 $330 Implemented
DS0175 # 03 Y:2000 03 2000 OPTIMIZE PLANT POWER FACTOR $1,540 $2,100 Implemented
DS0140 # 04 Y:1999 04 1999 RECOVER AND REUSE WASTE MATERIAL $641 $60 Implemented
DS0140 # 07 Y:1999 07 1999 PAY BILLS ON TIME TO AVOID LATE FEES $70 $0 Implemented
DS0140 # 01 Y:1999 01 1999 OPTIMIZE PLANT POWER FACTOR $1,918 $1,190 Implemented
DS0139 # 01 Y:1999 01 1999 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $560 $270 Implemented
DS0139 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $882 $500 Implemented
DS0139 # 03 Y:1999 03 1999 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,693 $391 Implemented
DS0139 # 06 Y:1999 06 1999 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $2,633 $7,000 Implemented
IA0199 # 01 Y:1998 01 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $15,640 $0 Implemented
IA0199 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,599 $52 Implemented
IA0199 # 04 Y:1998 04 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,818 $760 Implemented
IA0199 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,594 $1,196 Implemented
DS0111 # 05 Y:1998 05 1998 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,065 $1,600 Implemented
DS0111 # 02 Y:1998 02 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,145 $0 Implemented
DS0111 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,394 $7,486 Implemented
DS0077 # 02 Y:1997 02 1997 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $162 $24 Implemented
DS0077 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,294 $3,482 Implemented
DS0076 # 03 Y:1997 03 1997 RECOVER AND REUSE COOLING WATER $8,657 $9,360 Implemented
DS0076 # 02 Y:1997 02 1997 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $704 $0 Implemented