IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

434

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0253 # 05 Y:2022 05 2022 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $21,572 $7,624 Not Implemented
IC0253 # 02 Y:2022 02 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $43,447 $8,510 Not Implemented
IC0253 # 04 Y:2022 04 2022 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $39,245 $13,624 Not Implemented
IC0253 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,199 $9,023 Not Implemented
IC0253 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $50 $0 Not Implemented
IP0106 # 01 Y:2018 01 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,724 $0 Not Implemented
IP0106 # 03 Y:2018 03 2018 RECOVER WASTE HEAT FROM EQUIPMENT $2,543 $9,687 Not Implemented
IP0106 # 02 Y:2018 02 2018 INSTALL OCCUPANCY SENSORS $548 $1,325 Implemented
IP0106 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,159 $21,897 Implemented
BD0492 # 11 Y:2016 11 2016 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $225 $200 n/a
BD0492 # 09 Y:2016 09 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $485 $1,200 n/a
BD0492 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $529 $75 n/a
BD0492 # 01 Y:2016 01 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,166 $21,060 n/a
BD0492 # 04 Y:2016 04 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,305 $500 n/a
BD0492 # 10 Y:2016 10 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $285 $200 n/a
BD0492 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $10,912 $4,050 n/a
BD0492 # 03 Y:2016 03 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,352 $2,600 n/a
BD0492 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,039 $20 n/a
BD0492 # 07 Y:2016 07 2016 INSTALL OCCUPANCY SENSORS $476 $600 n/a
BD0492 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,299 $6,032 n/a
BD0490 # 02 Y:2016 02 2016 USE PHOTOCELL CONTROLS $7,997 $2,000 Not Implemented
BD0490 # 01 Y:2016 01 2016 INSULATE BARE EQUIPMENT $14,526 $1,150 Not Implemented
BD0490 # 10 Y:2016 10 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $394 $400 Not Implemented
BD0490 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,025 $2,501 Not Implemented
BD0490 # 06 Y:2016 06 2016 USE RADIANT HEATER FOR SPOT HEATING $1,813 $1,100 Not Implemented