IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

339

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0115 # 04 Y:2001 04 2001 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $64,282 $500,000 Not Implemented
SU0115 # 05 Y:2001 05 2001 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $81,279 $750,000 Not Implemented
SU0115 # 06 Y:2001 06 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $80 $0 Implemented
SU0115 # 07 Y:2001 07 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $6,188 $8,325 Implemented
SU0115 # 08 Y:2001 08 2001 REPAIR AND ELIMINATE STEAM LEAKS $14,780 $9,400 Implemented
WI0391 # 01 Y:2001 01 2001 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $19,523 $0 Not Implemented
WI0391 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,794 $90 Implemented
WI0391 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $130 $0 Not Implemented
WI0391 # 06 Y:2001 06 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $364 $283 Not Implemented
WI0391 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $372 $2,000 Not Implemented
WI0391 # 04 Y:2001 04 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,913 $971 Not Implemented
WI0391 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $393 $640 Implemented
AM0388 # 01 Y:2001 01 2001 OPTIMIZE PLANT POWER FACTOR $22,600 $23,800 Implemented
AM0388 # 02 Y:2001 02 2001 PAY BILLS ON TIME TO AVOID LATE FEES $3,700 $0 Implemented
AM0388 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,550 $500 Implemented
AM0388 # 04 Y:2001 04 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,200 $0 Not Implemented
AM0388 # 05 Y:2001 05 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,920 $4,211 Not Implemented
AM0388 # 06 Y:2001 06 2001 USE SYNTHETIC LUBRICANT $930 $0 Implemented
AM0388 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $745 $310 Implemented
SD0269 # 01 Y:2001 01 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $97,717 $166,000 Not Implemented
SD0269 # 02 Y:2001 02 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $41,894 $58,000 Not Implemented
SD0269 # 03 Y:2001 03 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,230 $1,700 Not Implemented
SD0269 # 04 Y:2001 04 2001 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $2,921 $0 Implemented
SD0269 # 05 Y:2001 05 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,060 $7,900 Implemented
SD0269 # 06 Y:2001 06 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $158,400 $2,500 Implemented