IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

990

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0789 # 08 Y:2009 08 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,410 $20,400 Not Implemented
UD0789 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,439 $8,250 Implemented
UD0789 # 10 Y:2009 10 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,610 $1,000 Implemented
UD0790 # 01 Y:2009 01 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $54,612 $1,000,000 Not Implemented
UD0790 # 02 Y:2009 02 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,932 $1,000 Implemented
UD0790 # 03 Y:2009 03 2009 INSULATE BARE EQUIPMENT $21,600 $7,416 Not Implemented
UD0790 # 04 Y:2009 04 2009 OPTIMIZE PLANT POWER FACTOR $9,216 $64,000 Not Implemented
UD0790 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,814 $11,000 Implemented
UD0790 # 06 Y:2009 06 2009 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $8,125 $10,000 Not Implemented
UD0790 # 07 Y:2009 07 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,637 $11,700 Not Implemented
UD0790 # 08 Y:2009 08 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,415 $10,000 Not Implemented
UD0790 # 09 Y:2009 09 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,728 $11,300 Not Implemented
UD0790 # 10 Y:2009 10 2009 UPGRADE CONTROLS ON COMPRESSORS $3,561 $200 Implemented
UD0790 # 11 Y:2009 11 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,374 $2,000 Implemented
UD0790 # 12 Y:2009 12 2009 CHECK FOR ACCURACY OF UTILITY / POWER METERS $2,006 $0 Implemented
UD0790 # 13 Y:2009 13 2009 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $1,658 $1,250 Not Implemented
UD0790 # 14 Y:2009 14 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $376 $1,000 Implemented
UM0347 # 01 Y:2008 01 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,638 $8,898 Not Implemented
UM0347 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,545 $6,240 Not Implemented
UM0347 # 03 Y:2008 03 2008 COVER OPEN TANKS $2,233 $1,046 Not Implemented
UM0347 # 04 Y:2008 04 2008 INSTALL OCCUPANCY SENSORS $1,503 $500 Not Implemented
UM0347 # 05 Y:2008 05 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $452 $422 Not Implemented
UM0347 # 06 Y:2008 06 2008 INSTALL AUTOMATIC STACK DAMPER $29,890 $8,100 Not Implemented
UD0784 # 01 Y:2008 01 2008 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME $123,480 $15,500 Not Implemented
UD0784 # 02 Y:2008 02 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $46,375 $75,000 Not Implemented