Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
203
matching recommendationsSIC | 3089 | Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0795 # 02 Y:2018 | 02 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,287 | $200 | Not Implemented |
MAS024 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,698 | $59,484 | Not Implemented |
MAS024 # 05 Y:2012 | 05 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,749 | $0 | Implemented |
MAS024 # 04 Y:2012 | 04 | 2012 | INSULATE BARE EQUIPMENT | $4,676 | $2,250 | Not Implemented |
MAS024 # 06 Y:2012 | 06 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,070 | $1,700 | Not Implemented |
MAS024 # 03 Y:2012 | 03 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,802 | $22,500 | Not Implemented |
MAS024 # 01 Y:2012 | 01 | 2012 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $19,562 | $150 | Implemented |
MAS024 # 07 Y:2012 | 07 | 2012 | INSULATE BARE EQUIPMENT | $241 | $345 | Not Implemented |
MA0683 # 05 Y:2011 | 05 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $821 | $200 | Implemented |
MA0683 # 02 Y:2011 | 02 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,021 | $2,800 | Implemented |
MA0683 # 01 Y:2011 | 01 | 2011 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $24,679 | $50,000 | Not Implemented |
MA0683 # 06 Y:2011 | 06 | 2011 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $486 | $100 | Implemented |
MA0683 # 03 Y:2011 | 03 | 2011 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,273 | $200 | Implemented |
MA0683 # 04 Y:2011 | 04 | 2011 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $1,113 | $200 | Implemented |
MA0659 # 04 Y:2010 | 04 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,781 | $7,735 | Not Implemented |
MA0659 # 02 Y:2010 | 02 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,141 | $119,100 | Implemented |
MA0659 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,273 | $1,800 | Implemented |
MA0659 # 03 Y:2010 | 03 | 2010 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $20,648 | $35,545 | Not Implemented |
MA0659 # 01 Y:2010 | 01 | 2010 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $35,538 | $103,290 | Implemented |
MA0523 # 02 Y:2002 | 02 | 2002 | OPTIMIZE PLANT POWER FACTOR | $6,907 | $11,770 | Implemented |
MA0523 # 06 Y:2002 | 06 | 2002 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $467 | $250 | Implemented |
MA0523 # 05 Y:2002 | 05 | 2002 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,423 | $2,200 | Not Implemented |
MA0523 # 03 Y:2002 | 03 | 2002 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,108 | $0 | Implemented |
MA0523 # 04 Y:2002 | 04 | 2002 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,510 | $0 | Implemented |
MA0523 # 01 Y:2002 | 01 | 2002 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $14,262 | $23,900 | Not Implemented |