Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
213
matching recommendationsSIC | 3089 | Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0044 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $493 | $160 | n/a |
MU0044 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $29,504 | $21,472 | n/a |
MU0042 # 07 Y:2023 | 07 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,365 | $25,500 | Not Implemented |
MU0042 # 06 Y:2023 | 06 | 2023 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $31,190 | $89,468 | Not Implemented |
MU0042 # 05 Y:2023 | 05 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $31,317 | $16,978 | Not Implemented |
MU0042 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $272 | $69 | Not Implemented |
MU0042 # 03 Y:2023 | 03 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $574 | $0 | Not Implemented |
MU0042 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,930 | $4,000 | Not Implemented |
MU0042 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,500 | $340 | Implemented |
CW0114 # 02 Y:2020 | 02 | 2020 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $10,400 | $0 | Implemented |
CW0114 # 10 Y:2020 | 10 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $356 | $90 | Implemented |
CW0114 # 09 Y:2020 | 09 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $1,244 | $110 | Not Implemented |
CW0114 # 08 Y:2020 | 08 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,024 | $10,137 | Not Implemented |
CW0114 # 07 Y:2020 | 07 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $199 | $1,350 | Not Implemented |
CW0114 # 06 Y:2020 | 06 | 2020 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,504 | $0 | Implemented |
CW0114 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,314 | $4,006 | Not Implemented |
CW0114 # 04 Y:2020 | 04 | 2020 | USE COMPRESSOR AIR FILTERS | $244 | $95 | Implemented |
CW0114 # 03 Y:2020 | 03 | 2020 | INSTALL SKYLIGHTS | $8,290 | $40,875 | Not Implemented |
CW0114 # 01 Y:2020 | 01 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,834 | $2,205 | Not Implemented |
IC0210 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,892 | $3,797 | Not Implemented |
IC0210 # 03 Y:2019 | 03 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,962 | $2,550 | Not Implemented |
IC0210 # 02 Y:2019 | 02 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $15,726 | $8,414 | Not Implemented |
IC0210 # 01 Y:2019 | 01 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $156,049 | $91,000 | Not Implemented |
UD0981 # 02 Y:2018 | 02 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,704 | $50 | Not Implemented |
UD0981 # 01 Y:2018 | 01 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,044 | $0 | Implemented |