IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

236

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0287 # 05 Y:2023 05 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $5,905 $1,050 n/a
TT0287 # 10 Y:2023 10 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,966 $6,750 n/a
TT0287 # 03 Y:2023 03 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $10,858 $7,500 n/a
TT0262 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,023 $2,762 Implemented
TT0262 # 02 Y:2021 02 2021 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,441 $15,000 Not Implemented
TT0262 # 04 Y:2021 04 2021 INSULATE BARE EQUIPMENT $4,646 $3,879 Implemented
TT0262 # 01 Y:2021 01 2021 USE SOLAR HEAT FOR HEAT $44,686 $476,000 Not Implemented
TT0262 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,405 $1,640 Not Implemented
TT0232 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,375 $3,375 Not Implemented
TT0232 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,442 $48,190 Not Implemented
TT0232 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $22,260 $107,529 Implemented
TT0232 # 03 Y:2019 03 2019 UPGRADE CONTROLS ON COMPRESSORS $9,856 $40 Not Implemented
TT0232 # 06 Y:2019 06 2019 INSULATE BARE EQUIPMENT $1,339 $1,060 Not Implemented
TT0232 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,941 $22,500 Not Implemented
TT0203 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,480 $4,250 Implemented
TT0203 # 03 Y:2018 03 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $7,071 $2,150 Not Implemented
TT0203 # 08 Y:2018 08 2018 APPLY FOR INVESTMENT INCENTIVES $619 $40 Not Implemented
TT0203 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,975 $94 Not Implemented
TT0203 # 07 Y:2018 07 2018 INSTALL TIMERS AND/OR THERMOSTATS $925 $250 Not Implemented
TT0203 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,746 $12,050 Not Implemented
TT0203 # 01 Y:2018 01 2018 COMBINE UTILITY METERS $273,385 $25,000 Implemented
TT0203 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $51,897 $23,022 Implemented
TT0155 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,646 $40,000 Implemented
TT0155 # 04 Y:2015 04 2015 INSULATE BARE EQUIPMENT $8,513 $625 Implemented
TT0155 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,382 $3,000 Implemented