IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

990

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0259 # 11 Y:2003 11 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,126 $800 Implemented
WV0259 # 12 Y:2003 12 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $217 $50 Implemented
UD0661 # 01 Y:2003 01 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $37,700 $25,000 Not Implemented
UD0661 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,395 $144,000 Not Implemented
UD0661 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,827 $18,100 Not Implemented
UD0661 # 04 Y:2003 04 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,298 $0 Not Implemented
UD0661 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,118 $4,730 Not Implemented
UD0661 # 06 Y:2003 06 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,028 $0 Not Implemented
UD0661 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,953 $4,602 Not Implemented
UD0661 # 08 Y:2003 08 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,620 $0 Not Implemented
UD0661 # 09 Y:2003 09 2003 UPGRADE CONTROLS ON COMPRESSORS $1,624 $0 Not Implemented
UD0661 # 10 Y:2003 10 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,325 $0 Not Implemented
UD0661 # 11 Y:2003 11 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,059 $1,513 Not Implemented
UD0661 # 12 Y:2003 12 2003 DISCONNECT BALLASTS $811 $45 Not Implemented
UD0661 # 13 Y:2003 13 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $663 $375 Not Implemented
UD0659 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $5,878 $3,000 Not Implemented
UD0659 # 05 Y:2002 05 2002 OPTIMIZE PLANT POWER FACTOR $5,400 $6,750 Implemented
UD0659 # 06 Y:2002 06 2002 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $5,040 $1,300 Not Implemented
UD0659 # 07 Y:2002 07 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,633 $0 Not Implemented
UD0659 # 08 Y:2002 08 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,464 $1,000 Implemented
UD0659 # 09 Y:2002 09 2002 USE RADIANT HEATER FOR SPOT HEATING $2,424 $6,000 Not Implemented
UD0659 # 10 Y:2002 10 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,776 $120 Implemented
UD0659 # 11 Y:2002 11 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,450 $1,985 Not Implemented
UD0659 # 12 Y:2002 12 2002 INSULATE BARE EQUIPMENT $1,196 $519 Not Implemented
UD0659 # 13 Y:2002 13 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $906 $1,785 Not Implemented