IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,727

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0201 # 07 Y:1998 07 1998 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $9,439 $26,000 Not Implemented
UF0201 # 08 Y:1998 08 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $10,150 $0 Not Implemented
UF0201 # 09 Y:1998 09 1998 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $16,296 $1,000 Implemented
SD0199 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,582 $750 Implemented
SD0199 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,572 $4,900 Implemented
SD0199 # 03 Y:1998 03 1998 PREHEAT COMBUSTION AIR WITH WASTE HEAT $2,756 $1,182 Implemented
SD0199 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,118 $16,039 Implemented
SD0199 # 05 Y:1998 05 1998 INSTALL SPECTRAL REFLECTORS / DELAMP $17,565 $11,460 Not Implemented
SD0199 # 06 Y:1998 06 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,118 $8,500 Implemented
SD0199 # 07 Y:1998 07 1998 ELIMINATE/REDUCE AN OPERATION $71,300 $0 Not Implemented
WI0320 # 04 Y:1998 04 1998 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,532 $0 Not Implemented
WI0320 # 05 Y:1998 05 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,433 $7,000 Not Implemented
WI0320 # 06 Y:1998 06 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $650 $740 Implemented
WI0320 # 01 Y:1998 01 1998 MOVE PRODUCT USING MECHANICAL MEANS $98,187 $100,000 Not Implemented
WI0320 # 02 Y:1998 02 1998 INSTALL TIMERS AND/OR THERMOSTATS $4,771 $600 Not Implemented
WI0320 # 03 Y:1998 03 1998 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,933 $6,400 Not Implemented
AS0223 # 01 Y:1998 01 1998 INSTALL OCCUPANCY SENSORS $627 $1,275 Not Implemented
AS0223 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,455 $2,300 Not Implemented
AS0223 # 03 Y:1998 03 1998 DISCONNECT BALLASTS $163 $15 Implemented
AS0223 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $113 $406 Not Implemented
AS0223 # 05 Y:1998 05 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $453 $755 Implemented
AS0223 # 06 Y:1998 06 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,184 $540 Implemented
AS0223 # 07 Y:1998 07 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,500 $60 Implemented
AS0223 # 08 Y:1998 08 1998 PURCHASE EQUIPMENT INSTEAD OF LEASING $3,300 $10,198 Not Implemented
AS0223 # 09 Y:1998 09 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $485,295 $705,960 Implemented