Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
990
matching recommendationsSIC | 3089 | Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0628 # 07 Y:2001 | 07 | 2001 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,858 | $0 | Implemented |
UD0628 # 08 Y:2001 | 08 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,827 | $4,000 | Not Implemented |
UD0628 # 09 Y:2001 | 09 | 2001 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,097 | $3,200 | Implemented |
UD0628 # 10 Y:2001 | 10 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $475 | $0 | Not Implemented |
WV0220 # 01 Y:2001 | 01 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,623 | $3,010 | Implemented |
WV0220 # 02 Y:2001 | 02 | 2001 | USE PHOTOCELL CONTROLS | $432 | $300 | Implemented |
WV0220 # 03 Y:2001 | 03 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,633 | $540 | Implemented |
WV0220 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $804 | $54 | Implemented |
WV0220 # 05 Y:2001 | 05 | 2001 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $241 | $36 | Implemented |
WV0220 # 06 Y:2001 | 06 | 2001 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,872 | $1,457 | Not Implemented |
WV0220 # 07 Y:2001 | 07 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,626 | $190 | Implemented |
WV0220 # 08 Y:2001 | 08 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,369 | $708 | Not Implemented |
WV0220 # 09 Y:2001 | 09 | 2001 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,742 | $3,132 | Not Implemented |
WV0220 # 10 Y:2001 | 10 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $4,164 | $1,080 | Implemented |
WV0220 # 11 Y:2001 | 11 | 2001 | BURN WASTE OIL FOR HEAT | $3,635 | $4,700 | Not Implemented |
WV0220 # 12 Y:2001 | 12 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $5,188 | $7,000 | Not Implemented |
WV0220 # 13 Y:2001 | 13 | 2001 | ADD ADDITIONAL PRODUCTION SHIFT | $110,160 | $63,182 | Not Implemented |
UD0627 # 01 Y:2001 | 01 | 2001 | REDUCE SCRAP PRODUCTION | $47,250 | $1,050 | n/a |
UD0627 # 02 Y:2001 | 02 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $32,010 | $101,000 | n/a |
UD0627 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $13,365 | $1,540 | n/a |
UD0627 # 04 Y:2001 | 04 | 2001 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,787 | $0 | n/a |
UD0627 # 05 Y:2001 | 05 | 2001 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,552 | $430 | n/a |
UD0627 # 06 Y:2001 | 06 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,378 | $7,000 | n/a |
UD0627 # 07 Y:2001 | 07 | 2001 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,215 | $4,790 | n/a |
UD0627 # 08 Y:2001 | 08 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $486 | $0 | n/a |