IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

990

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0530 # 02 Y:1997 02 1997 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $3,250 $5,600 Implemented
UD0530 # 03 Y:1997 03 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $34,540 $37,500 Not Implemented
UD0530 # 04 Y:1997 04 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $24,402 $0 Implemented
UD0530 # 05 Y:1997 05 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $51,015 $200,000 Not Implemented
UD0530 # 06 Y:1997 06 1997 RECOVER WASTE HEAT FROM EQUIPMENT $32,833 $66,000 Not Implemented
UD0525 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,300 $40 n/a
UD0525 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,791 $1,000 n/a
UD0525 # 03 Y:1997 03 1997 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $6,041 $0 n/a
UD0525 # 04 Y:1997 04 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $7,992 $6,000 n/a
UD0525 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,954 $5,047 n/a
UD0525 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,450 $9,153 n/a
UD0525 # 07 Y:1997 07 1997 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $3,203 $1,000 n/a
UD0525 # 08 Y:1997 08 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,420 $3,456 n/a
UD0525 # 09 Y:1997 09 1997 RECOVER WASTE HEAT FROM EQUIPMENT $5,680 $4,000 n/a
UD0525 # 10 Y:1997 10 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $28,482 $0 n/a
UD0522 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,126 $6,975 Implemented
UD0522 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $647 $2,000 Implemented
UD0522 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,104 $16,862 Implemented
UD0522 # 04 Y:1997 04 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $33,190 $7,500 Not Implemented
UD0522 # 05 Y:1997 05 1997 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $22,129 $4,000 Implemented
UD0522 # 06 Y:1997 06 1997 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $18,194 $10,000 Not Implemented
UD0522 # 07 Y:1997 07 1997 MINIMIZE WATER USAGE $3,644 $3,500 Not Implemented
UD0522 # 08 Y:1997 08 1997 BURN A LESS EXPENSIVE GRADE OF FUEL $11,573 $5,000 Not Implemented
UD0521 # 01 Y:1997 01 1997 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,099 $0 Implemented
UD0521 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $630 $100 Implemented