IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,685

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0357 # 10 Y:1989 10 1989 OPTIMIZE PLANT POWER FACTOR $4,607 $6,600 Implemented
RU0036 # 01 Y:1988 01 1988 AIR CONDITION ONLY SPACE NECESSARY $2,449 $4,244 Not Implemented
RU0036 # 02 Y:1988 02 1988 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,900 $26,730 Not Implemented
RU0036 # 03 Y:1988 03 1988 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,637 $2,780 Not Implemented
RU0036 # 04 Y:1988 04 1988 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,523 $2,268 Not Implemented
RU0036 # 05 Y:1988 05 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,611 $0 Implemented
RU0036 # 06 Y:1988 06 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,145 $2,600 Not Implemented
RU0036 # 07 Y:1988 07 1988 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,862 $4,000 Not Implemented
KU0269 # 01 Y:1988 01 1988 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $17,859 $10,000 Not Implemented
KU0269 # 02 Y:1988 02 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,858 $0 Implemented
KU0269 # 03 Y:1988 03 1988 INSTALL TIMERS AND/OR THERMOSTATS $5,967 $5,600 Implemented
KU0269 # 04 Y:1988 04 1988 INSTALL AUTOMATIC STACK DAMPER $243 $450 Not Implemented
KU0269 # 05 Y:1988 05 1988 RECOVER AND REUSE COOLING WATER $728 $0 Not Implemented
KU0269 # 06 Y:1988 06 1988 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $166 $0 Implemented
MA0128 # 01 Y:1988 01 1988 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $8,672 $16,500 Implemented
MA0128 # 02 Y:1988 02 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,463 $0 Not Implemented
MA0128 # 03 Y:1988 03 1988 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,562 $0 Implemented
MA0128 # 04 Y:1988 04 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $216 $69 Implemented
MA0128 # 05 Y:1988 05 1988 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $570 $250 Implemented
MA0128 # 06 Y:1988 06 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,384 $6,500 Implemented
GT0355 # 01 Y:1988 01 1988 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $7,437 $7,830 Not Implemented
GT0355 # 02 Y:1988 02 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $535 $300 Implemented
GT0355 # 03 Y:1988 03 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $702 $85 Implemented
GT0355 # 04 Y:1988 04 1988 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $136 $140 Not Implemented
GT0355 # 05 Y:1988 05 1988 USE RADIANT HEATER FOR SPOT HEATING $11,594 $25,480 Implemented