Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
327
matching recommendationsSIC | 3089 | Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0525 # 02 Y:2019 | 02 | 2019 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $13,500 | $33,800 | Not Implemented |
UF0525 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,245 | $18,331 | Implemented |
UF0525 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,084 | $4,798 | Implemented |
UF0525 # 05 Y:2019 | 05 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $3,145 | $3,960 | Implemented |
UF0525 # 06 Y:2019 | 06 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,312 | $464 | Implemented |
UF0525 # 07 Y:2019 | 07 | 2019 | ISOLATE HOT OR COLD EQUIPMENT | $1,061 | $2,108 | Not Implemented |
UF0525 # 08 Y:2019 | 08 | 2019 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $35,380 | $15,216 | Not Implemented |
UF0525 # 09 Y:2019 | 09 | 2019 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $34,636 | $10,000 | Not Implemented |
UF0524 # 01 Y:2019 | 01 | 2019 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $371,464 | $1,750,000 | Not Implemented |
UF0524 # 02 Y:2019 | 02 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $212,420 | $75,000 | Not Implemented |
UF0524 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $62,330 | $139,780 | Implemented |
UF0524 # 04 Y:2019 | 04 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $22,663 | $18,928 | Not Implemented |
UF0524 # 05 Y:2019 | 05 | 2019 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $19,167 | $89,865 | Not Implemented |
UF0524 # 06 Y:2019 | 06 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,978 | $400 | Implemented |
UF0524 # 07 Y:2019 | 07 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,897 | $0 | Implemented |
UF0524 # 08 Y:2019 | 08 | 2019 | ISOLATE HOT OR COLD EQUIPMENT | $4,945 | $5,090 | Not Implemented |
UF0524 # 09 Y:2019 | 09 | 2019 | TREAT AND REUSE RINSE WATERS | $17,615 | $0 | Implemented |
MI0343 # 09 Y:2018 | 09 | 2018 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,896 | $6,486 | Implemented |
MI0343 # 08 Y:2018 | 08 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,552 | $7,675 | Implemented |
MI0343 # 07 Y:2018 | 07 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,421 | $1,005 | Not Implemented |
MI0343 # 06 Y:2018 | 06 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $16,044 | $2,973 | Not Implemented |
MI0343 # 05 Y:2018 | 05 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $17,400 | $71,328 | Implemented |
MI0343 # 04 Y:2018 | 04 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $30,500 | $3,280 | Implemented |
MI0343 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $32,079 | $2,030 | Implemented |
MI0343 # 02 Y:2018 | 02 | 2018 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $37,140 | $43,838 | Not Implemented |