Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
275
matching recommendationsSIC | 3089 | Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0129 # 07 Y:2002 | 07 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $60 | $0 | Not Implemented |
SU0129 # 08 Y:2002 | 08 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $24 | $22 | Not Implemented |
SU0125 # 01 Y:2001 | 01 | 2001 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,561 | $0 | Implemented |
SU0125 # 02 Y:2001 | 02 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,467 | $0 | Implemented |
SU0125 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,122 | $20,070 | Implemented |
SU0125 # 04 Y:2001 | 04 | 2001 | INSTALL OCCUPANCY SENSORS | $2,096 | $665 | Not Implemented |
SU0125 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,687 | $342 | Not Implemented |
SU0125 # 06 Y:2001 | 06 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,313 | $840 | Not Implemented |
SU0125 # 07 Y:2001 | 07 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $920 | $3,275 | Not Implemented |
SU0125 # 08 Y:2001 | 08 | 2001 | OPTIMIZE PLANT POWER FACTOR | $4,470 | $6,200 | Implemented |
SU0125 # 09 Y:2001 | 09 | 2001 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $34,312 | $0 | Implemented |
SU0125 # 10 Y:2001 | 10 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $8,216 | $9,990 | Not Implemented |
SU0125 # 11 Y:2001 | 11 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,719 | $760 | Implemented |
SU0115 # 01 Y:2001 | 01 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,222 | $0 | Implemented |
SU0115 # 02 Y:2001 | 02 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,645 | $225 | Implemented |
SU0115 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,834 | $0 | Not Implemented |
SU0115 # 04 Y:2001 | 04 | 2001 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $64,282 | $500,000 | Not Implemented |
SU0115 # 05 Y:2001 | 05 | 2001 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $81,279 | $750,000 | Not Implemented |
SU0115 # 06 Y:2001 | 06 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $80 | $0 | Implemented |
SU0115 # 07 Y:2001 | 07 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $6,188 | $8,325 | Implemented |
SU0115 # 08 Y:2001 | 08 | 2001 | REPAIR AND ELIMINATE STEAM LEAKS | $14,780 | $9,400 | Implemented |
MA0479 # 01 Y:2000 | 01 | 2000 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,300 | $3,000 | Implemented |
MA0479 # 02 Y:2000 | 02 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,900 | $8,400 | Implemented |
MA0479 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,310 | $550 | Implemented |
MA0479 # 04 Y:2000 | 04 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,760 | $5,800 | Not Implemented |