Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0232 # 15 Y:2024 15 2024 UPGRADE CONTROLS ON COMPRESSORS $6,886 $20,000 n/a
DL0232 # 08 Y:2024 08 2024 RECOVER WASTE HEAT FROM EQUIPMENT $2,946 $10,000 n/a
DL0232 # 06 Y:2024 06 2024 INSTALL TIMERS AND/OR THERMOSTATS $7,288 $84 n/a
DL0232 # 05 Y:2024 05 2024 INSTALL TIMERS AND/OR THERMOSTATS $10,552 $112 n/a
DL0232 # 03 Y:2024 03 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $848 $0 n/a
DL0232 # 02 Y:2024 02 2024 INSTALL TIMERS AND/OR THERMOSTATS $4,060 $166 n/a
DL0232 # 18 Y:2024 18 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,092 $10,000 n/a
DL0232 # 16 Y:2024 16 2024 UPGRADE CONTROLS ON COMPRESSORS $14,220 $30,000 n/a
DL0232 # 17 Y:2024 17 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,477 $2,488 n/a
DL0232 # 14 Y:2024 14 2024 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,758 $1,500 n/a
DL0232 # 10 Y:2024 10 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $546 $0 n/a
DL0232 # 12 Y:2024 12 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,886 $5,000 n/a
DL0232 # 13 Y:2024 13 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,930 $7,995 n/a
DL0232 # 09 Y:2024 09 2024 RECOVER WASTE HEAT FROM EQUIPMENT $9,568 $10,000 n/a
DL0232 # 11 Y:2024 11 2024 INSULATE BARE EQUIPMENT $500 $340 n/a
DL0232 # 01 Y:2024 01 2024 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $1,952 $0 n/a
DL0232 # 04 Y:2024 04 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,563 $0 n/a
DL0232 # 07 Y:2024 07 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,850 $1,637 n/a
DL0198 # 09 Y:2021 09 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,740 $14,428 Implemented
DL0198 # 01 Y:2021 01 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,850 $0 Implemented
DL0198 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,800 $0 Implemented
DL0198 # 08 Y:2021 08 2021 RECOVER WASTE HEAT FROM EQUIPMENT $4,320 $7,000 Not Implemented
DL0198 # 04 Y:2021 04 2021 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $16,090 $1,500 Not Implemented
DL0198 # 05 Y:2021 05 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,240 $2,500 Implemented
DL0198 # 06 Y:2021 06 2021 INSULATE BARE EQUIPMENT $2,034 $5,600 Not Implemented