Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
434
matching recommendationsSIC | 3089 | Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0253 # 05 Y:2022 | 05 | 2022 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $21,572 | $7,624 | Not Implemented |
IC0253 # 02 Y:2022 | 02 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $43,447 | $8,510 | Not Implemented |
IC0253 # 04 Y:2022 | 04 | 2022 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $39,245 | $13,624 | Not Implemented |
IC0253 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,199 | $9,023 | Not Implemented |
IC0253 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $50 | $0 | Not Implemented |
IP0106 # 01 Y:2018 | 01 | 2018 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,724 | $0 | Not Implemented |
IP0106 # 03 Y:2018 | 03 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,543 | $9,687 | Not Implemented |
IP0106 # 02 Y:2018 | 02 | 2018 | INSTALL OCCUPANCY SENSORS | $548 | $1,325 | Implemented |
IP0106 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,159 | $21,897 | Implemented |
BD0492 # 11 Y:2016 | 11 | 2016 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $225 | $200 | n/a |
BD0492 # 09 Y:2016 | 09 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $485 | $1,200 | n/a |
BD0492 # 08 Y:2016 | 08 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $529 | $75 | n/a |
BD0492 # 01 Y:2016 | 01 | 2016 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $17,166 | $21,060 | n/a |
BD0492 # 04 Y:2016 | 04 | 2016 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,305 | $500 | n/a |
BD0492 # 10 Y:2016 | 10 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $285 | $200 | n/a |
BD0492 # 02 Y:2016 | 02 | 2016 | INSULATE BARE EQUIPMENT | $10,912 | $4,050 | n/a |
BD0492 # 03 Y:2016 | 03 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,352 | $2,600 | n/a |
BD0492 # 06 Y:2016 | 06 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,039 | $20 | n/a |
BD0492 # 07 Y:2016 | 07 | 2016 | INSTALL OCCUPANCY SENSORS | $476 | $600 | n/a |
BD0492 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,299 | $6,032 | n/a |
BD0490 # 02 Y:2016 | 02 | 2016 | USE PHOTOCELL CONTROLS | $7,997 | $2,000 | Not Implemented |
BD0490 # 01 Y:2016 | 01 | 2016 | INSULATE BARE EQUIPMENT | $14,526 | $1,150 | Not Implemented |
BD0490 # 10 Y:2016 | 10 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $394 | $400 | Not Implemented |
BD0490 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,025 | $2,501 | Not Implemented |
BD0490 # 06 Y:2016 | 06 | 2016 | USE RADIANT HEATER FOR SPOT HEATING | $1,813 | $1,100 | Not Implemented |