IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

186

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0308 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,047 $1,210 Not Implemented
MZ0308 # 02 Y:2021 02 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,647 $5,300 Not Implemented
MZ0308 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,438 $24,586 Not Implemented
MZ0278 # 10 Y:2019 10 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,709 $200 Implemented
MZ0278 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $53,880 $7,750 Not Implemented
MZ0278 # 08 Y:2019 08 2019 RECOVER WASTE HEAT FROM EQUIPMENT $35,571 $11,900 Not Implemented
MZ0278 # 02 Y:2019 02 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $382,507 $601,250 Implemented
MZ0278 # 01 Y:2019 01 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $902,475 $6,762,500 Implemented
MZ0278 # 03 Y:2019 03 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $176,232 $3,250 Implemented
MZ0278 # 04 Y:2019 04 2019 REDUCE SCRAP PRODUCTION $126,263 $207,500 Implemented
MZ0278 # 09 Y:2019 09 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,558 $870 Implemented
MZ0278 # 07 Y:2019 07 2019 UPGRADE CONTROLS ON COMPRESSORS $42,284 $13,051 Implemented
MZ0278 # 06 Y:2019 06 2019 INSULATE BARE EQUIPMENT $45,917 $2,907 Implemented
MZ0247 # 01 Y:2018 01 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $29,241 $3,340 Not Implemented
MZ0247 # 07 Y:2018 07 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,794 $740 Not Implemented
MZ0247 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,430 $4,900 Implemented
MZ0247 # 06 Y:2018 06 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,053 $170 Not Implemented
MZ0247 # 03 Y:2018 03 2018 INSTALL OCCUPANCY SENSORS $6,231 $2,346 Implemented
MZ0247 # 02 Y:2018 02 2018 OPTIMIZE PLANT POWER FACTOR $13,764 $10,000 Not Implemented
MZ0247 # 05 Y:2018 05 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,573 $500 Not Implemented
OK0925 # 03 Y:2015 03 2015 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $160 $214 Implemented
OK0925 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,930 $9,328 Not Implemented
OK0925 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,255 $71,792 Not Implemented
OK0925 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,762 $933 Implemented
OK0925 # 11 Y:2015 11 2015 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $5,100 $9,690 Not Implemented