Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
990
matching recommendationsSIC | 3089 | Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CW0129 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,398 | $72,618 | n/a |
CW0129 # 05 Y:2023 | 05 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $10,872 | $21,000 | n/a |
CW0129 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $951 | $180 | n/a |
CW0129 # 03 Y:2023 | 03 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $20,343 | $37,000 | n/a |
CW0129 # 02 Y:2023 | 02 | 2023 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $21,901 | $86,580 | n/a |
CW0129 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $10,973 | $2,300 | n/a |
UD1041 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,960 | $604 | Not Implemented |
UD1041 # 06 Y:2022 | 06 | 2022 | REDUCE VENTILATION AIR | $26,031 | $45,000 | Not Implemented |
UD1041 # 04 Y:2022 | 04 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,702 | $0 | Not Implemented |
UD1041 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $69,148 | $18,523 | Not Implemented |
UD1041 # 01 Y:2022 | 01 | 2022 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $12,355 | $0 | Not Implemented |
UD1041 # 02 Y:2022 | 02 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,327 | $0 | Not Implemented |
UD1039 # 06 Y:2022 | 06 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,654 | $50 | Not Implemented |
UD1039 # 02 Y:2022 | 02 | 2022 | INSULATE BARE EQUIPMENT | $1,123 | $714 | Not Implemented |
UD1039 # 04 Y:2022 | 04 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,423 | $5,000 | Not Implemented |
UD1039 # 03 Y:2022 | 03 | 2022 | INSTALL OCCUPANCY SENSORS | $306 | $202 | Not Implemented |
UD1039 # 01 Y:2022 | 01 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $55 | $0 | Not Implemented |
UD1039 # 07 Y:2022 | 07 | 2022 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $1,304 | $2,369 | Not Implemented |
UD1039 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $875 | $316 | Not Implemented |
UD1017 # 03 Y:2020 | 03 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,662 | $17,500 | Implemented |
UD1017 # 01 Y:2020 | 01 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $20,892 | $0 | Implemented |
UD1017 # 02 Y:2020 | 02 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,500 | $0 | Implemented |
UD1017 # 07 Y:2020 | 07 | 2020 | OPTIMIZE PLANT POWER FACTOR | $25,311 | $31,200 | Not Implemented |
UD1017 # 05 Y:2020 | 05 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $2,128 | $500 | Not Implemented |
UD1017 # 06 Y:2020 | 06 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $955 | $0 | Not Implemented |