IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

240

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0036 # 04 Y:2013 04 2013 INSULATE BARE EQUIPMENT $1,540 $5,355 Not Implemented
WM0036 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $396 $200 Not Implemented
WM0036 # 05 Y:2013 05 2013 IMPROVE SPACE COMFORT CONDITIONING $3,641 $595 Not Implemented
WM0036 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,340 $1,900 Implemented
WM0036 # 06 Y:2013 06 2013 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $7,574 $780 Not Implemented
WM0036 # 03 Y:2013 03 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $783 $4,255 Not Implemented
WM0036 # 01 Y:2013 01 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $288 $0 Implemented
TT0121 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $2,202 $2,150 Not Implemented
TT0121 # 05 Y:2013 05 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,667 $9,338 Not Implemented
TT0121 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,465 $100 Implemented
TT0121 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,685 $8,460 Implemented
TT0121 # 04 Y:2013 04 2013 COMBINE UTILITY METERS $6,476 $12,000 Not Implemented
TT0121 # 07 Y:2013 07 2013 UPGRADE CONTROLS ON COMPRESSORS $464 $800 Implemented
TT0121 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47 $75 Implemented
NC0503 # 05 Y:2013 05 2013 RECOVER WASTE HEAT FROM EQUIPMENT $7,771 $1,900 Not Implemented
NC0503 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $128,043 $171,848 Not Implemented
NC0503 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,179 $7,472 Not Implemented
NC0503 # 04 Y:2013 04 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $107,579 $110,000 Not Implemented
NC0503 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,944 $3,969 Not Implemented
NC0503 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $16,865 $10,990 Not Implemented
NC0503 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,203 $100 Implemented
MZ0133 # 11 Y:2013 11 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $55,279 $350,000 Implemented
MZ0133 # 10 Y:2013 10 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $915 $1,050 Implemented
MZ0133 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,288 $24,000 Implemented
MZ0133 # 04 Y:2013 04 2013 INSULATE BARE EQUIPMENT $25,086 $2,277 Implemented