IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

476

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0146 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $2,510 $200 Not Implemented
UM0146 # 04 Y:1999 04 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $15,807 $40,000 Not Implemented
UM0146 # 05 Y:1999 05 1999 USE A RAG RECYCLE SERVICE $925 $0 Not Implemented
UM0146 # 06 Y:1999 06 1999 $6,000 $3,600 Not Implemented
UM0146 # 07 Y:1999 07 1999 $11,207 $40,000 Not Implemented
MA0444 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,858 $0 Implemented
MA0444 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $303 $117 Implemented
MA0444 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $322 $248 Implemented
MA0444 # 04 Y:1999 04 1999 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $879 $4,225 Not Implemented
MA0444 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $114 $470 Not Implemented
MA0444 # 06 Y:1999 06 1999 $3,766 $0 Not Implemented
ND0327 # 01 Y:1999 01 1999 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $17,546 $25,000 Implemented
ND0327 # 02 Y:1999 02 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $1,497 $240 Not Implemented
ND0327 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,029 $1,500 Not Implemented
ND0327 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $744 $1,392 Implemented
ND0327 # 05 Y:1999 05 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $564 $420 Not Implemented
ND0327 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $140 $315 Not Implemented
ND0327 # 07 Y:1999 07 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $105 $120 Not Implemented
ND0327 # 08 Y:1999 08 1999 MINIMIZE WATER USAGE $510 $1,150 Not Implemented
ND0327 # 09 Y:1999 09 1999 $16,882 $0 Implemented
ND0327 # 10 Y:1999 10 1999 $1,106 $0 Implemented
ND0327 # 11 Y:1999 11 1999 $429 $0 Not Implemented
SD0232 # 01 Y:1999 01 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $8,010 $11,160 Implemented
SD0232 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,708 $21,250 Implemented
SD0232 # 03 Y:1999 03 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,337 $2,500 Not Implemented