Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
287
matching recommendationsSIC | 3089 | Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0197 # 03 Y:2000 | 03 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,257 | $242 | Not Implemented |
WV0197 # 04 Y:2000 | 04 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $669 | $610 | Implemented |
WV0197 # 05 Y:2000 | 05 | 2000 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,365 | $920 | Implemented |
WV0197 # 06 Y:2000 | 06 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $58,583 | $15,828 | Not Implemented |
WV0197 # 07 Y:2000 | 07 | 2000 | BURN WASTE OIL FOR HEAT | $28,800 | $1,579 | Not Implemented |
WV0197 # 08 Y:2000 | 08 | 2000 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $7,200 | $200 | Not Implemented |
WV0197 # 09 Y:2000 | 09 | 2000 | $20,000 | $9,800 | Not Implemented | |
GT0692 # 01 Y:2000 | 01 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,357 | $2,000 | Implemented |
GT0692 # 02 Y:2000 | 02 | 2000 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $7,810 | $1,000 | Implemented |
GT0692 # 03 Y:2000 | 03 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,690 | $4,000 | Implemented |
GT0692 # 04 Y:2000 | 04 | 2000 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,465 | $500 | Not Implemented |
GT0692 # 05 Y:2000 | 05 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $53,500 | $170,000 | Not Implemented |
GT0692 # 06 Y:2000 | 06 | 2000 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $9,831 | $26,400 | Not Implemented |
GT0692 # 07 Y:2000 | 07 | 2000 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $19,321 | $41,750 | Not Implemented |
GT0692 # 08 Y:2000 | 08 | 2000 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $5,155 | $0 | Not Implemented |
WV0196 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $321 | $80 | Implemented |
WV0196 # 02 Y:2000 | 02 | 2000 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,521 | $3,970 | Not Implemented |
WV0196 # 03 Y:2000 | 03 | 2000 | INSULATE BARE EQUIPMENT | $11,584 | $699 | Implemented |
WV0196 # 04 Y:2000 | 04 | 2000 | USE OPTIMUM THICKNESS INSULATION | $264 | $298 | Implemented |
WV0196 # 05 Y:2000 | 05 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $11,981 | $688 | Implemented |
WV0196 # 06 Y:2000 | 06 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $745 | $432 | Not Implemented |
WV0196 # 07 Y:2000 | 07 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $950 | $20 | Implemented |
WV0196 # 08 Y:2000 | 08 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $328 | $401 | Implemented |
WV0196 # 09 Y:2000 | 09 | 2000 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $2,040 | $150 | Implemented |
WV0196 # 10 Y:2000 | 10 | 2000 | $2,000 | $658 | Not Implemented |