2,670
matching recommendationsSIC | 32 | Stone, Clay, And Glass Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0570 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $55,246 | $42,000 | Implemented |
LE0570 # 06 Y:2024 | 06 | 2024 | INSTALL BACK-UP EQUIPMENT | $46,731 | $90,000 | Implemented |
LE0570 # 05 Y:2024 | 05 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,252 | $5,000 | Implemented |
LE0570 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,515 | $15,000 | Implemented |
LE0570 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $25,168 | $26,500 | Implemented |
LE0570 # 01 Y:2024 | 01 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,292 | $0 | Implemented |
AS0571 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $81,526 | $55,952 | Implemented |
AS0571 # 06 Y:2024 | 06 | 2024 | USE POWER DURING OFF-PEAK PERIODS | $492 | $511 | Implemented |
AS0571 # 05 Y:2024 | 05 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,292 | $908 | Implemented |
AS0571 # 03 Y:2024 | 03 | 2024 | PAY BILLS ON TIME TO AVOID LATE FEES | $22,882 | $38 | Implemented |
AS0571 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,525 | $34,427 | Implemented |
UW2404 # 05 Y:2024 | 05 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $15,990 | $112,500 | Implemented |
UW2404 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $34,140 | $25,000 | Implemented |
UW2404 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $141,402 | $150,381 | Implemented |
UW2404 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,693 | $75,000 | Implemented |
SF0616 # 04 Y:2024 | 04 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $61,055 | $261,561 | Implemented |
SF0616 # 03 Y:2024 | 03 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $551 | $550 | Implemented |
TT0308 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,802 | $5,726 | Implemented |
UW2317 # 05 Y:2023 | 05 | 2023 | IMPROVE COMBUSTION CONTROL CAPABILITY | $30,104 | $300,000 | Implemented |
UW2317 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $533 | $0 | Implemented |
UW2317 # 04 Y:2023 | 04 | 2023 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $31,756 | $1,000,000 | Implemented |
UW2317 # 02 Y:2023 | 02 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $658 | $1,096 | Implemented |
UW2317 # 03 Y:2023 | 03 | 2023 | INSTALL STORM WINDOWS AND DOORS | $156 | $1,901 | Implemented |
UW2315 # 02 Y:2023 | 02 | 2023 | IMPROVE COMBUSTION CONTROL CAPABILITY | $30,104 | $300,000 | Implemented |
UW2315 # 01 Y:2023 | 01 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,189 | $1,896 | Implemented |