Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,628
matching recommendationsSIC | 32 | Stone, Clay, And Glass Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2313 # 03 Y:2023 | 03 | 2023 | INSTALL OCCUPANCY SENSORS | $2,452 | $75 | Implemented |
LS2313 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,049 | $50 | Implemented |
LS2313 # 06 Y:2023 | 06 | 2023 | IMPROVE COMBUSTION CONTROL CAPABILITY | $87,048 | $400,000 | Implemented |
LS2313 # 02 Y:2023 | 02 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,259 | $150 | Implemented |
LS2313 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,021 | $180 | Implemented |
LS2313 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,862 | $187 | Implemented |
UF0600 # 06 Y:2023 | 06 | 2023 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,118 | $591 | Implemented |
UF0600 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,508 | $584 | Implemented |
UF0600 # 02 Y:2023 | 02 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $17,863 | $38,735 | Implemented |
UF0600 # 05 Y:2023 | 05 | 2023 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $1,132 | $1,440 | Implemented |
UF0600 # 03 Y:2023 | 03 | 2023 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $4,976 | $11,866 | Implemented |
UF0600 # 07 Y:2023 | 07 | 2023 | IMPROVE SPACE COMFORT CONDITIONING | $32,555 | $3,179 | Implemented |
UF0599 # 10 Y:2023 | 10 | 2023 | IMPROVE SPACE COMFORT CONDITIONING | $34,250 | $2,384 | Implemented |
UF0599 # 02 Y:2023 | 02 | 2023 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $57,942 | $18,000 | Implemented |
UF0599 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,225 | $412 | Implemented |
UF0599 # 09 Y:2023 | 09 | 2023 | INSTALL TURBULATORS | $4,318 | $5,000 | Implemented |
UF0599 # 03 Y:2023 | 03 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $39,593 | $8,330 | Implemented |
UF0599 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,242 | $9,619 | Implemented |
UF0599 # 08 Y:2023 | 08 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,851 | $24,000 | Implemented |
UF0599 # 04 Y:2023 | 04 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $31,388 | $12,420 | Implemented |
LS2312 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $563 | $525 | Implemented |
IC0283 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $350 | $840 | Implemented |
IC0283 # 02 Y:2023 | 02 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $192 | $13 | Implemented |
IC0283 # 01 Y:2023 | 01 | 2023 | INSULATE BARE EQUIPMENT | $112 | $886 | Implemented |
WV0647 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,516 | $864 | Implemented |