IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

86

matching recommendations
Reset
SIC 32 Stone, Clay, And Glass Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0700 # 05 Y:2012 05 2012 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,934 $500 Implemented
MA0690 # 01 Y:2012 01 2012 INSULATE BARE EQUIPMENT $3,246 $1,750 Implemented
MA0690 # 02 Y:2012 02 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,986 $7,500 Not Implemented
MA0690 # 04 Y:2012 04 2012 MODERATE COOLING TOWER OUTLET TEMPERATURE $1,582 $4,075 Not Implemented
MA0690 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,892 $4,075 Implemented
MA0584 # 04 Y:2005 04 2005 INSULATE BARE EQUIPMENT $2,152 $1,400 Implemented
MA0584 # 05 Y:2005 05 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,098 $9,400 Not Implemented
MA0584 # 01 Y:2005 01 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,369 $2,100 Implemented
MA0584 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,880 $2,800 Implemented
MA0584 # 03 Y:2005 03 2005 USE RADIANT HEATER FOR SPOT HEATING $3,727 $11,326 Not Implemented
MA0524 # 03 Y:2002 03 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,776 $16,000 n/a
MA0524 # 07 Y:2002 07 2002 INSULATE BARE EQUIPMENT $179 $750 Implemented
MA0524 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,117 $2,000 Implemented
MA0524 # 02 Y:2002 02 2002 $14,755 $45,000 Not Implemented
MA0524 # 04 Y:2002 04 2002 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,719 $13,000 n/a
MA0524 # 01 Y:2002 01 2002 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $31,997 $0 Not Implemented
MA0524 # 06 Y:2002 06 2002 INSULATE BARE EQUIPMENT $501 $158 Implemented
MA0505 # 05 Y:2002 05 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,441 $5,848 Not Implemented
MA0505 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,523 $2,000 Not Implemented
MA0505 # 03 Y:2002 03 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,893 $55,300 Not Implemented
MA0505 # 04 Y:2002 04 2002 BURN A LESS EXPENSIVE GRADE OF FUEL $13,130 $25,484 Not Implemented
MA0505 # 01 Y:2002 01 2002 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $55,391 $74,250 Not Implemented
MA0505 # 02 Y:2002 02 2002 REPLACE TREATED WATER WITH WELL / SURFACE WATER $37,920 $18,500 Not Implemented
MA0499 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,235 $255 Not Implemented
MA0499 # 05 Y:2001 05 2001 RECOVER WASTE HEAT FROM EQUIPMENT $5,936 $12,650 Not Implemented