IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
SIC 32 Stone, Clay, And Glass Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0391 # 02 Y:2009 02 2009 USE PHOTOCELL CONTROLS $11,811 $6,850 Not Implemented
WV0391 # 01 Y:2009 01 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $27,893 $26,000 Not Implemented
WV0391 # 10 Y:2009 10 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $374 $300 Implemented
MI0179 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,117 $40 Implemented
MI0179 # 05 Y:2009 05 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,234 $4,531 Not Implemented
MI0179 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,351 $1,210 Implemented
MI0179 # 03 Y:2009 03 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $23,952 $3,320 Implemented
MI0179 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,203 $31,350 Not Implemented
MI0179 # 01 Y:2009 01 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,487 $31,140 Not Implemented
UW0028 # 07 Y:2009 07 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $847 $560 Not Implemented
LL0311 # 06 Y:2009 06 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $94 $210 Implemented
LL0311 # 05 Y:2009 05 2009 INSTALL OCCUPANCY SENSORS $147 $760 Not Implemented
LL0311 # 04 Y:2009 04 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $522 $1,650 Not Implemented
LL0311 # 03 Y:2009 03 2009 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,635 $600 Implemented
UW0028 # 08 Y:2009 08 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $144 $0 Implemented
LL0311 # 01 Y:2009 01 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $17,835 $9,450 Not Implemented
UW0028 # 06 Y:2009 06 2009 METER WASTE WATER $1,060 $12,000 Implemented
UW0028 # 05 Y:2009 05 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,663 $31,539 Not Implemented
UW0028 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $12,524 $1,960 Implemented
UW0028 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,942 $76,700 Implemented
UW0028 # 02 Y:2009 02 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $323,442 $485,164 Not Implemented
UW0028 # 01 Y:2009 01 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,467,516 $2,201,270 Not Implemented
LL0311 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,239 $680 Implemented
UW0025 # 03 Y:2009 03 2009 USE OPTIMUM TEMPERATURE $13,200 $19,800 Implemented
UW0025 # 02 Y:2009 02 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,361 $17,335 Not Implemented