Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,698
matching recommendationsSIC | 32 | Stone, Clay, And Glass Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0708 # 01 Y:2015 | 01 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,880 | $460 | Implemented |
CO0708 # 02 Y:2015 | 02 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,260 | $8,620 | Not Implemented |
CO0708 # 03 Y:2015 | 03 | 2015 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $5,290 | $500 | Implemented |
UM0459 # 01 Y:2015 | 01 | 2015 | INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER | $115,156 | $525,000 | Not Implemented |
UM0459 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $982 | $800 | Not Implemented |
UM0459 # 03 Y:2015 | 03 | 2015 | ADJUST BURNERS FOR EFFICIENT OPERATION | $299,710 | $30,000 | Implemented |
LE0396 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $702 | $35 | Implemented |
LE0396 # 02 Y:2015 | 02 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,655 | $4,000 | Not Implemented |
LE0396 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,080 | $2,845 | Implemented |
LE0396 # 04 Y:2015 | 04 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $214 | $105 | Implemented |
LE0396 # 05 Y:2015 | 05 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,534 | $1,644 | Implemented |
LE0396 # 06 Y:2015 | 06 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,473 | $1,950 | Not Implemented |
LE0396 # 07 Y:2015 | 07 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $405 | $1,000 | Implemented |
LE0396 # 08 Y:2015 | 08 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,304 | $9,400 | Not Implemented |
LE0396 # 09 Y:2015 | 09 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,431 | $13,983 | Not Implemented |
LE0396 # 10 Y:2015 | 10 | 2015 | REPLACE BOILER | $4,068 | $18,400 | Not Implemented |
UD0925 # 01 Y:2015 | 01 | 2015 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $860 | $0 | Implemented |
UD0925 # 02 Y:2015 | 02 | 2015 | INSULATE BARE EQUIPMENT | $221,454 | $15,345 | Not Implemented |
UD0925 # 03 Y:2015 | 03 | 2015 | USE OPTIMUM TEMPERATURE | $46,665 | $0 | Not Implemented |
UD0925 # 04 Y:2015 | 04 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $4,804 | $34,000 | Not Implemented |
UD0925 # 05 Y:2015 | 05 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,759 | $5,000 | Not Implemented |
UD0925 # 06 Y:2015 | 06 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,964 | $1,000 | Implemented |
UD0925 # 07 Y:2015 | 07 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,405 | $66,200 | Not Implemented |
UD0925 # 08 Y:2015 | 08 | 2015 | INSTALL SENSORS TO DETECT AND AVOID JAMS | $7,714 | $120,000 | Implemented |
UD0925 # 09 Y:2015 | 09 | 2015 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $5,400 | $0 | Not Implemented |