IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 32 Stone, Clay, And Glass Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0547 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,491 $9,434 Implemented
WV0547 # 06 Y:2017 06 2017 ADJUST BURNERS FOR EFFICIENT OPERATION $970 $4,600 Implemented
WV0547 # 08 Y:2017 08 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $412 $2,050 Implemented
WV0547 # 09 Y:2017 09 2017 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $243 $1,000 Implemented
WV0547 # 10 Y:2017 10 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $175 $850 Implemented
WV0547 # 01 Y:2017 01 2017 INSULATE BARE EQUIPMENT $15,992 $5,658 Implemented
LE0139 # 01 Y:2002 01 2002 $97,133 $238,263 Implemented
LE0139 # 03 Y:2002 03 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,359 $0 Implemented
WV0245 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $945 $0 Implemented
WV0245 # 10 Y:2002 10 2002 $3,800 $690 Implemented
WV0245 # 08 Y:2002 08 2002 USE PHOTOCELL CONTROLS $579 $300 Implemented
WV0245 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,109 $138 Implemented
WV0245 # 05 Y:2002 05 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $6,015 $230 Implemented
WV0245 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $414 $100 Implemented
WV0245 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $348 $151 Implemented
WV0245 # 01 Y:2002 01 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,684 $0 Implemented
RU0060 # 01 Y:1989 01 1989 REPAIR AND ELIMINATE STEAM LEAKS $20,786 $0 Implemented
RU0060 # 02 Y:1989 02 1989 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $18,359 $16,835 Implemented
RU0060 # 04 Y:1989 04 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,256 $0 Implemented
RU0060 # 05 Y:1989 05 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,180 $102 Implemented
RU0060 # 06 Y:1989 06 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,072 $1,500 Implemented