IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
SIC 32 Stone, Clay, And Glass Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0435 # 01 Y:2008 01 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,332 $252 Implemented
IA0435 # 09 Y:2008 09 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,838 $15 Implemented
IA0435 # 08 Y:2008 08 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,096 $317 Not Implemented
IA0435 # 07 Y:2008 07 2008 INSTALL OCCUPANCY SENSORS $552 $1,309 Implemented
IA0435 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,172 $1,917 Not Implemented
IA0435 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,079 $36,423 Not Implemented
IA0435 # 04 Y:2008 04 2008 COVER OPEN TANKS $881 $225 Not Implemented
IA0435 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $978 $240 Implemented
IA0435 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,663 $45 Not Implemented
DS0121 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN WATER LINES AND VALVES $962 $74 Implemented
DS0121 # 04 Y:1998 04 1998 $1,620 $1,350 Not Implemented
DS0121 # 03 Y:1998 03 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $679 $50 Implemented
DS0121 # 06 Y:1998 06 1998 MINIMIZE USE OF RAGS THROUGH WORKER TRAINING $11,700 $700 Not Implemented
DS0121 # 07 Y:1998 07 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $700 $6 Implemented
DS0121 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $240 $250 Implemented
DS0121 # 01 Y:1998 01 1998 INSTALL TIMERS AND/OR THERMOSTATS $1,311 $1,155 Not Implemented
DS0121 # 08 Y:1998 08 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $16,640 $0 Implemented
DS0090 # 08 Y:1997 08 1997 $70,200 $65,000 Implemented
DS0090 # 07 Y:1997 07 1997 REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS $13,750 $19,000 Implemented
DS0090 # 06 Y:1997 06 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $13,735 $9,500 Implemented
DS0090 # 05 Y:1997 05 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $10,196 $32,400 Not Implemented
DS0090 # 04 Y:1997 04 1997 UTILIZE A LESS EXPENSIVE COOLING METHOD $16,937 $20,000 Implemented
DS0090 # 03 Y:1997 03 1997 COVER OPEN TANKS $634 $242 Not Implemented
DS0090 # 02 Y:1997 02 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,210 $1,910 Implemented
DS0090 # 01 Y:1997 01 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,097 $1,800 Implemented