IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 32 Stone, Clay, And Glass Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0714 # 08 Y:2013 08 2013 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS $1,360 $150 Implemented
MA0714 # 07 Y:2013 07 2013 OPTIMIZE PLANT POWER FACTOR $11,188 $13,500 Implemented
MA0714 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,354 $9,300 Not Implemented
MA0714 # 05 Y:2013 05 2013 INSULATE BARE EQUIPMENT $4,187 $7,500 Not Implemented
MA0714 # 04 Y:2013 04 2013 INSULATE BARE EQUIPMENT $4,919 $12,300 Not Implemented
MA0714 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,362 $13,800 Implemented
MA0714 # 02 Y:2013 02 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $9,831 $5,568 Implemented
MA0714 # 01 Y:2013 01 2013 BURN A LESS EXPENSIVE GRADE OF FUEL $64,988 $67,000 Implemented
MA0696 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,462 $6,035 Not Implemented
MA0696 # 09 Y:2012 09 2012 INSULATE BARE EQUIPMENT $622 $1,100 Not Implemented
MA0696 # 08 Y:2012 08 2012 INSTALL OCCUPANCY SENSORS $1,705 $4,080 Implemented
MA0696 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,810 $200 Implemented
MA0696 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,048 $6,600 Implemented
MA0696 # 04 Y:2012 04 2012 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,539 $17,500 Not Implemented
MA0696 # 03 Y:2012 03 2012 USE OPTIMUM TEMPERATURE $6,647 $4,000 Not Implemented
MA0696 # 02 Y:2012 02 2012 REPAIR AND ELIMINATE STEAM LEAKS $15,781 $2,800 Implemented
MA0696 # 01 Y:2012 01 2012 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $19,393 $39,000 Implemented
MA0489 # 01 Y:2001 01 2001 RECOVER WASTE HEAT FROM EQUIPMENT $113,500 $270,000 n/a
MA0489 # 06 Y:2001 06 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $170 $120 Not Implemented
MA0489 # 05 Y:2001 05 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $870 $1,000 Not Implemented
MA0489 # 04 Y:2001 04 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,700 $2,000 Not Implemented
MA0489 # 03 Y:2001 03 2001 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $9,700 $180 Implemented
MA0489 # 02 Y:2001 02 2001 RECOVER AND REUSE WASTE MATERIAL $54,000 $40,000 n/a