Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
278
matching recommendationsSIC | 32 | Stone, Clay, And Glass Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0239 # 02 Y:1999 | 02 | 1999 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,096 | $0 | Implemented |
UF0239 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,938 | $0 | Not Implemented |
UF0239 # 03 Y:1999 | 03 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $25,982 | $0 | Implemented |
UF0239 # 04 Y:1999 | 04 | 1999 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $53,580 | $0 | Implemented |
UF0239 # 05 Y:1999 | 05 | 1999 | CLEAR AND RENT EXISTING SPACE | $118,736 | $0 | Not Implemented |
MS0149 # 02 Y:1999 | 02 | 1999 | INSTALL TIMERS AND/OR THERMOSTATS | $74 | $119 | Not Implemented |
MS0149 # 04 Y:1999 | 04 | 1999 | USE OPTIMUM THICKNESS INSULATION | $15,653 | $9,593 | Not Implemented |
MS0149 # 03 Y:1999 | 03 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,504 | $2,060 | Implemented |
MS0149 # 01 Y:1999 | 01 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $790 | $263 | Implemented |
GT0676 # 08 Y:1999 | 08 | 1999 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $16,324 | $35,000 | Not Implemented |
GT0676 # 06 Y:1999 | 06 | 1999 | COMBINE UTILITY METERS | $292 | $0 | Not Implemented |
GT0676 # 04 Y:1999 | 04 | 1999 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $20,293 | $15,000 | Not Implemented |
GT0676 # 01 Y:1999 | 01 | 1999 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $3,081 | $500 | Not Implemented |
GT0676 # 07 Y:1999 | 07 | 1999 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $1,295 | $100 | Not Implemented |
GT0676 # 03 Y:1999 | 03 | 1999 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $29,047 | $12,000 | Not Implemented |
GT0676 # 02 Y:1999 | 02 | 1999 | RECOVER AND REUSE WASTE MATERIAL | $11,148 | $0 | Implemented |
GT0676 # 05 Y:1999 | 05 | 1999 | IMPROVE SPACE COMFORT CONDITIONING | $33,650 | $18,000 | Not Implemented |
UL0232 # 02 Y:1999 | 02 | 1999 | RECOVER AND REUSE COOLING WATER | $9,701 | $446 | Not Implemented |
UL0232 # 03 Y:1999 | 03 | 1999 | RECOVER AND REUSE COOLING WATER | $56,903 | $5,370 | Implemented |
UL0232 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,709 | $100 | Not Implemented |
NV0135 # 04 Y:1999 | 04 | 1999 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $3,746 | $9,000 | Not Implemented |
NV0135 # 03 Y:1999 | 03 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,386 | $10,530 | Not Implemented |
AS0262 # 05 Y:1999 | 05 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $3,402 | $120 | Not Implemented |
AS0262 # 06 Y:1999 | 06 | 1999 | METER WASTE WATER | $2,057 | $5,000 | Not Implemented |
AS0262 # 07 Y:1999 | 07 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $178,632 | $50,000 | Not Implemented |