Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
91
matching recommendationsSIC | 32 | Stone, Clay, And Glass Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0535 # 01 Y:2022 | 01 | 2022 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,534 | $44,427 | Implemented |
AS0535 # 04 Y:2022 | 04 | 2022 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $539 | $156 | Implemented |
AS0535 # 03 Y:2022 | 03 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,081 | $17,428 | Not Implemented |
AS0535 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,698 | $7,427 | Not Implemented |
WV0635 # 07 Y:2022 | 07 | 2022 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $2,027 | $394 | Implemented |
WV0635 # 04 Y:2022 | 04 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $3,209 | $6,354 | Not Implemented |
WV0635 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,990 | $4,945 | Implemented |
WV0635 # 05 Y:2022 | 05 | 2022 | INSTALL SET-BACK TIMERS | $3,167 | $1,125 | Not Implemented |
WV0635 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,309 | $218 | Implemented |
WV0635 # 09 Y:2022 | 09 | 2022 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $672 | $1,500 | Implemented |
WV0635 # 11 Y:2022 | 11 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $57 | $88 | Implemented |
WV0635 # 10 Y:2022 | 10 | 2022 | DEVELOP A REPAIR/REPLACE POLICY | $546 | $1,571 | Implemented |
WV0635 # 08 Y:2022 | 08 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $949 | $525 | Implemented |
WV0635 # 01 Y:2022 | 01 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,179 | $6,500 | Not Implemented |
WV0635 # 02 Y:2022 | 02 | 2022 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $4,325 | $5,360 | Not Implemented |
UU0207 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO HEAT WATER | $15,757 | $75,487 | Not Implemented |
UU0207 # 03 Y:2022 | 03 | 2022 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $6,884 | $750 | Implemented |
UU0207 # 05 Y:2022 | 05 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,912 | $1,585 | Implemented |
UU0207 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $850 | $1,000 | Implemented |
UU0207 # 02 Y:2022 | 02 | 2022 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $7,250 | $5,000 | Not Implemented |
UU0207 # 08 Y:2022 | 08 | 2022 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $265 | $750 | Implemented |
UU0207 # 04 Y:2022 | 04 | 2022 | OPTIMIZE PLANT POWER FACTOR | $4,008 | $3,433 | Implemented |
UU0207 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $626 | $1,700 | Implemented |
UF0582 # 06 Y:2022 | 06 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,793 | $79,204 | Implemented |
UF0582 # 05 Y:2022 | 05 | 2022 | USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC | $207,860 | $705,580 | Not Implemented |