IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 321 Flat Glass
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0510 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,926 $45,000 Implemented
LE0510 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,017 $17,100 Implemented
LE0510 # 09 Y:2021 09 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $1,245,175 $9,990,000 Not Implemented
LE0510 # 08 Y:2021 08 2021 REPLACE BOILER $334,294 $1,800,000 Implemented
LE0510 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,653 $100,000 Implemented
LE0510 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,899 $12,800 Implemented
LE0510 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,596 $33,000 Not Implemented
LE0510 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,170 $21,000 Implemented
LE0510 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,951 $30,000 Implemented
WV0167 # 07 Y:1999 07 1999 $12,120 $800 Implemented
WV0167 # 06 Y:1999 06 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $804 $5,500 Not Implemented
WV0167 # 05 Y:1999 05 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,784 $10,000 Not Implemented
WV0167 # 04 Y:1999 04 1999 BURN A LESS EXPENSIVE GRADE OF FUEL $22,359 $12,500 Not Implemented
WV0167 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $5,901 $606 Implemented
WV0167 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $809 $315 Not Implemented
WV0167 # 01 Y:1999 01 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,173 $1,000 Implemented
WV0167 # 08 Y:1999 08 1999 $4,160 $0 Not Implemented
WV0152 # 09 Y:1998 09 1998 RECYCLE FLUORESCENT LAMPS $400 $45 Not Implemented
WV0152 # 08 Y:1998 08 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $960 $50 Implemented
WV0152 # 07 Y:1998 07 1998 BURN A LESS EXPENSIVE GRADE OF FUEL $9,550 $8,400 Not Implemented
WV0152 # 06 Y:1998 06 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,785 $1,355 Not Implemented
WV0152 # 05 Y:1998 05 1998 INSULATE BARE EQUIPMENT $236 $732 Implemented
WV0152 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $447 $171 Implemented
WV0152 # 03 Y:1998 03 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,558 $2,600 Not Implemented
WV0152 # 02 Y:1998 02 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $758 $700 Implemented