Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
234
matching recommendationsSIC | 3211 | Flat Glass |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0765 # 04 Y:2018 | 04 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,210 | $22 | Not Implemented |
AM0765 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,060 | $1,000 | Implemented |
AM0765 # 02 Y:2018 | 02 | 2018 | OPTIMIZE PLANT POWER FACTOR | $71,530 | $81,610 | Implemented |
AM0765 # 06 Y:2018 | 06 | 2018 | INSTALL OCCUPANCY SENSORS | $510 | $595 | Implemented |
AM0765 # 01 Y:2018 | 01 | 2018 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $173,300 | $721,800 | Not Implemented |
DL0155 # 01 Y:2015 | 01 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,690 | $0 | Implemented |
DL0155 # 02 Y:2015 | 02 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $500 | $0 | Implemented |
DL0155 # 03 Y:2015 | 03 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $8,960 | $6,880 | Not Implemented |
DL0155 # 04 Y:2015 | 04 | 2015 | SHADE WINDOWS FROM SUMMER SUN | $1,760 | $6,840 | Not Implemented |
DL0155 # 05 Y:2015 | 05 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,405 | $13,615 | Not Implemented |
SD0513 # 01 Y:2015 | 01 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $10,628 | $42,560 | Not Implemented |
SD0513 # 02 Y:2015 | 02 | 2015 | COVER OPEN TANKS | $4,719 | $415 | Not Implemented |
SD0513 # 03 Y:2015 | 03 | 2015 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $1,873 | $200 | Not Implemented |
SD0513 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,240 | $2,500 | Not Implemented |
SD0513 # 05 Y:2015 | 05 | 2015 | INSTALL OCCUPANCY SENSORS | $505 | $350 | Not Implemented |
SD0513 # 06 Y:2015 | 06 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $356 | $72 | Not Implemented |
UD0931 # 05 Y:2015 | 05 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,304 | $0 | Implemented |
UD0931 # 02 Y:2015 | 02 | 2015 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $185,788 | $193 | Not Implemented |
UD0931 # 12 Y:2015 | 12 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,628 | $83,660 | Implemented |
UD0931 # 11 Y:2015 | 11 | 2015 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $3,127 | $9,200 | Not Implemented |
UD0931 # 10 Y:2015 | 10 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,937 | $41,800 | Implemented |
UD0931 # 09 Y:2015 | 09 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,769 | $24,400 | Implemented |
UD0931 # 08 Y:2015 | 08 | 2015 | REDUCE FLUID FLOW RATES | $14,443 | $14,964 | Not Implemented |
UD0931 # 06 Y:2015 | 06 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $108,502 | $151,300 | Implemented |
UD0931 # 01 Y:2015 | 01 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $108,029 | $0 | Not Implemented |