Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
345
matching recommendationsSIC | 3229 | Pressed And Blown Glass, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0641 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,929 | $16,830 | n/a |
SD0641 # 08 Y:2023 | 08 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $628 | $1,441 | n/a |
SD0641 # 06 Y:2023 | 06 | 2023 | INSULATE BARE EQUIPMENT | $252 | $1,171 | n/a |
SD0641 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,834 | $21,620 | n/a |
SD0641 # 03 Y:2023 | 03 | 2023 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $2,501 | $11,000 | n/a |
SD0641 # 09 Y:2023 | 09 | 2023 | ADJUST BURNERS FOR EFFICIENT OPERATION | $3,019 | $7,800 | n/a |
SD0641 # 10 Y:2023 | 10 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,049 | $6,650 | n/a |
SD0641 # 05 Y:2023 | 05 | 2023 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,325 | $8,632 | n/a |
SD0641 # 11 Y:2023 | 11 | 2023 | INSULATE BARE EQUIPMENT | $347 | $332 | n/a |
SD0641 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $46,189 | $70,634 | n/a |
SD0641 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,553 | $19,352 | n/a |
SD0641 # 12 Y:2023 | 12 | 2023 | USE MORE EFFICIENT ADHESIVE APPLICATORS | $80,045 | $6,600 | n/a |
WV0612 # 03 Y:2021 | 03 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $15,446 | $16,700 | Implemented |
WV0612 # 10 Y:2021 | 10 | 2021 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $701 | $397 | Implemented |
WV0612 # 07 Y:2021 | 07 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,008 | $8,132 | Implemented |
WV0612 # 09 Y:2021 | 09 | 2021 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $1,090 | $1,341 | Not Implemented |
WV0612 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,798 | $7,637 | Not Implemented |
WV0612 # 06 Y:2021 | 06 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,641 | $4,320 | Implemented |
WV0612 # 11 Y:2021 | 11 | 2021 | INSTALL SET-BACK TIMERS | $611 | $1,110 | Implemented |
WV0612 # 02 Y:2021 | 02 | 2021 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $22,389 | $99,385 | Not Implemented |
WV0612 # 08 Y:2021 | 08 | 2021 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $1,683 | $8,044 | Not Implemented |
WV0612 # 04 Y:2021 | 04 | 2021 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $13,924 | $27,550 | Not Implemented |
WV0612 # 01 Y:2021 | 01 | 2021 | CONVERT TO OXYFUEL BURNERS | $30,507 | $81,760 | Not Implemented |
NC0629 # 06 Y:2019 | 06 | 2019 | INSTALL / REPAIR INSULATION ON STEAM LINES | $329 | $250 | Not Implemented |
NC0629 # 07 Y:2019 | 07 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $35,842 | $115,000 | Not Implemented |