Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
61
matching recommendationsSIC | 3229 | Pressed And Blown Glass, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0612 # 08 Y:2021 | 08 | 2021 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $1,683 | $8,044 | Not Implemented |
WV0612 # 07 Y:2021 | 07 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,008 | $8,132 | Implemented |
WV0612 # 03 Y:2021 | 03 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $15,446 | $16,700 | Implemented |
WV0612 # 06 Y:2021 | 06 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,641 | $4,320 | Implemented |
WV0612 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,798 | $7,637 | Not Implemented |
WV0612 # 04 Y:2021 | 04 | 2021 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $13,924 | $27,550 | Not Implemented |
WV0612 # 10 Y:2021 | 10 | 2021 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $701 | $397 | Implemented |
WV0612 # 01 Y:2021 | 01 | 2021 | CONVERT TO OXYFUEL BURNERS | $30,507 | $81,760 | Not Implemented |
WV0612 # 09 Y:2021 | 09 | 2021 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $1,090 | $1,341 | Not Implemented |
WV0612 # 11 Y:2021 | 11 | 2021 | INSTALL SET-BACK TIMERS | $611 | $1,110 | Implemented |
WV0612 # 02 Y:2021 | 02 | 2021 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $22,389 | $99,385 | Not Implemented |
WV0175 # 03 Y:1999 | 03 | 1999 | REPAIR OR REPLACE STEAM TRAPS | $426,829 | $88,360 | Implemented |
WV0175 # 04 Y:1999 | 04 | 1999 | OPTIMIZE PLANT POWER FACTOR | $14,700 | $14,700 | Implemented |
WV0175 # 02 Y:1999 | 02 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $332 | $204 | Not Implemented |
WV0175 # 01 Y:1999 | 01 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $177 | $200 | Not Implemented |
WV0175 # 06 Y:1999 | 06 | 1999 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $7,884 | $0 | Implemented |
WV0175 # 05 Y:1999 | 05 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $8,476 | $884 | Implemented |
WV0175 # 07 Y:1999 | 07 | 1999 | $262,080 | $0 | Not Implemented | |
WV0174 # 11 Y:1999 | 11 | 1999 | $42,323 | $8,219 | Not Implemented | |
WV0174 # 07 Y:1999 | 07 | 1999 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,338 | $0 | Implemented |
WV0174 # 08 Y:1999 | 08 | 1999 | REPLACE BOILER | $1,371 | $9,000 | Not Implemented |
WV0174 # 09 Y:1999 | 09 | 1999 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $60 | $0 | Implemented |
WV0174 # 02 Y:1999 | 02 | 1999 | INSTALL OCCUPANCY SENSORS | $161 | $125 | Not Implemented |
WV0174 # 04 Y:1999 | 04 | 1999 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $229,919 | $1,000 | Implemented |
WV0174 # 01 Y:1999 | 01 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $210 | $200 | Implemented |