Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
269
matching recommendationsSIC | 3229 | Pressed And Blown Glass, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0618 # 03 Y:2007 | 03 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $12,316 | $3,220 | Implemented |
MA0618 # 09 Y:2007 | 09 | 2007 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $1,070 | $340 | Implemented |
MA0618 # 02 Y:2007 | 02 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $32,820 | $26,621 | Implemented |
MA0618 # 06 Y:2007 | 06 | 2007 | INSULATE BARE EQUIPMENT | $7,795 | $1,924 | Implemented |
MA0618 # 08 Y:2007 | 08 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $4,125 | $3,552 | Implemented |
MA0618 # 04 Y:2007 | 04 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,204 | $29,875 | Implemented |
MA0618 # 01 Y:2007 | 01 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $47,879 | $79,554 | Implemented |
MA0618 # 05 Y:2007 | 05 | 2007 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $10,589 | $17,740 | Implemented |
MA0618 # 07 Y:2007 | 07 | 2007 | OPTIMIZE PLANT POWER FACTOR | $4,906 | $18,500 | Implemented |
LL0272 # 10 Y:2007 | 10 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $517 | $5,436 | Not Implemented |
LL0272 # 01 Y:2007 | 01 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $102,410 | $49,360 | Not Implemented |
LL0272 # 04 Y:2007 | 04 | 2007 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $7,489 | $422 | Not Implemented |
LL0272 # 02 Y:2007 | 02 | 2007 | INSULATE BARE EQUIPMENT | $58,782 | $19,636 | Implemented |
LL0272 # 06 Y:2007 | 06 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,024 | $1,499 | Not Implemented |
LL0272 # 08 Y:2007 | 08 | 2007 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,020 | $2,338 | Not Implemented |
LL0272 # 09 Y:2007 | 09 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $903 | $1,169 | Not Implemented |
LL0272 # 07 Y:2007 | 07 | 2007 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $832 | $830 | Not Implemented |
LL0272 # 03 Y:2007 | 03 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,485 | $7,000 | Not Implemented |
LL0272 # 05 Y:2007 | 05 | 2007 | INSTALL SKYLIGHTS | $2,828 | $5,040 | Not Implemented |
SU0254 # 03 Y:2007 | 03 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,618 | $0 | Implemented |
SU0254 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,048 | $381 | Implemented |
SU0254 # 04 Y:2007 | 04 | 2007 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $18,564 | $2,486 | Not Implemented |
SU0254 # 01 Y:2007 | 01 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,902 | $0 | Implemented |
SU0254 # 06 Y:2007 | 06 | 2007 | INSULATE BARE EQUIPMENT | $440 | $69 | Implemented |
SU0254 # 02 Y:2007 | 02 | 2007 | USE SYNTHETIC LUBRICANT | $3,743 | $0 | Implemented |