IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

101

matching recommendations
Reset
SIC 3241 Cement, Hydraulic
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0061 # 06 Y:1992 06 1992 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $236,795 $750,000 Implemented
AS0061 # 07 Y:1992 07 1992 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $107,027 $6,700 Implemented
AS0061 # 08 Y:1992 08 1992 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $129,176 $640,000 Implemented
AS0061 # 09 Y:1992 09 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,933 $2,000 Implemented
OK0270 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,950 $8,048 Implemented
OK0270 # 04 Y:1988 04 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,483 $3,750 Implemented
GT0352 # 02 Y:1988 02 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,420 $6,873 Implemented
CO0079 # 02 Y:1986 02 1986 IMPROVE LUBRICATION PRACTICES $56,931 $0 Implemented
CO0079 # 04 Y:1986 04 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $26,207 $7,000 Implemented
CO0079 # 05 Y:1986 05 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,012 $12,000 Implemented
CO0079 # 06 Y:1986 06 1986 INSTALL TIMERS AND/OR THERMOSTATS $3,423 $46 Implemented
CO0079 # 07 Y:1986 07 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,097 $3,098 Implemented
CO0079 # 08 Y:1986 08 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,816 $1,000 Implemented
KU0169 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $48,005 $6,000 Implemented
KU0169 # 03 Y:1985 03 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $13,083 $5,000 Implemented
KU0169 # 04 Y:1985 04 1985 OPTIMIZE PLANT POWER FACTOR $7,711 $37,000 Implemented
KU0169 # 05 Y:1985 05 1985 INSTALL SET-BACK TIMERS $8,360 $622 Implemented
KU0169 # 06 Y:1985 06 1985 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $7,219 $13,000 Implemented
KU0169 # 07 Y:1985 07 1985 INSTALL AUTOMATIC STACK DAMPER $4,581 $1,700 Implemented
KU0169 # 08 Y:1985 08 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,579 $0 Implemented
KU0169 # 09 Y:1985 09 1985 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,472 $500 Implemented
KU0169 # 12 Y:1985 12 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,444 $550 Implemented
KU0169 # 13 Y:1985 13 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,374 $580 Implemented
KU0169 # 14 Y:1985 14 1985 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $605 $0 Implemented
KU0169 # 15 Y:1985 15 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $598 $50 Implemented