IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
Reset
SIC 3259 Structural Clay Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0317 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,972 $15,200 Not Implemented
SD0317 # 03 Y:2003 03 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $4,354 $16 Not Implemented
SD0317 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,969 $200 Not Implemented
SD0317 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,481 $4,500 Not Implemented
SD0317 # 06 Y:2003 06 2003 INSTALL SKYLIGHTS $1,552 $600 Not Implemented
SD0317 # 07 Y:2003 07 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,800 $10,000 Not Implemented
SD0317 # 01 Y:2003 01 2003 UPGRADE OBSOLETE EQUIPMENT $18,680 $350 Not Implemented
UD0636 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $20,587 $7,200 Implemented
UD0636 # 01 Y:2002 01 2002 INCREASE USE OF AUTOMATION $62,400 $0 Implemented
UD0636 # 10 Y:2002 10 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $736 $300 Implemented
UD0636 # 03 Y:2002 03 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $20,230 $25,000 Implemented
UD0636 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,509 $2,880 Implemented
UD0636 # 09 Y:2002 09 2002 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $1,223 $0 Implemented
UD0636 # 08 Y:2002 08 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,335 $420 Implemented
UD0636 # 04 Y:2002 04 2002 OPTIMIZE PLANT POWER FACTOR $4,987 $3,750 Implemented
UD0636 # 05 Y:2002 05 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,247 $500 Implemented
UD0636 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,668 $1,185 Implemented
UL0232 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,709 $100 Not Implemented
UL0232 # 03 Y:1999 03 1999 RECOVER AND REUSE COOLING WATER $56,903 $5,370 Implemented
UL0232 # 02 Y:1999 02 1999 RECOVER AND REUSE COOLING WATER $9,701 $446 Not Implemented
TN0628 # 01 Y:1998 01 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $82,700 $77,200 Not Implemented
TN0628 # 06 Y:1998 06 1998 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $3,690 $10,500 Implemented
TN0628 # 08 Y:1998 08 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,560 $2,170 Implemented
TN0628 # 09 Y:1998 09 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,950 $0 Implemented
TN0628 # 10 Y:1998 10 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,835 $0 Not Implemented