IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
SIC 326 Pottery And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0292 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $22,577 $0 Not Implemented
SU0292 # 09 Y:2010 09 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,849 $24,883 Not Implemented
SU0292 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,377 $81,156 Not Implemented
SU0292 # 10 Y:2010 10 2010 MOVE BOILER TO MORE EFFICIENT LOCATION $6,648 $60,575 Not Implemented
SU0292 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,292 $962 Implemented
SU0292 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $57,316 $175,000 Not Implemented
SU0292 # 08 Y:2010 08 2010 OPTIMIZE PLANT POWER FACTOR $12,124 $37,200 Not Implemented
SU0292 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,754 $5,714 Not Implemented
SU0292 # 05 Y:2010 05 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $274 $560 Not Implemented
SU0292 # 02 Y:2010 02 2010 REPAIR AND ELIMINATE STEAM LEAKS $4,309 $46 Implemented
SU0271 # 08 Y:2008 08 2008 REPLACE BOILER $199,772 $200,000 Not Implemented
SU0271 # 11 Y:2008 11 2008 OPTIMIZE PLANT POWER FACTOR $7,023 $25,839 Not Implemented
SU0271 # 10 Y:2008 10 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $747 $1,615 Not Implemented
SU0271 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,088 $52,435 Implemented
SU0271 # 07 Y:2008 07 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $31,841 $16,299 Not Implemented
SU0271 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $773 $249 Not Implemented
SU0271 # 05 Y:2008 05 2008 INSULATE FEEDWATER TANK $3,428 $746 Not Implemented
SU0271 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,111 $1,559 Not Implemented
SU0271 # 03 Y:2008 03 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $16,435 $2,841 Not Implemented
SU0271 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $36,827 $3,125 Not Implemented
SU0271 # 01 Y:2008 01 2008 $2,751 $0 Not Implemented
SU0229 # 14 Y:2006 14 2006 INSULATE BARE EQUIPMENT $781 $2,198 Not Implemented
SU0229 # 13 Y:2006 13 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $372 $845 Not Implemented
SU0229 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,893 $630 Implemented
SU0229 # 08 Y:2006 08 2006 KEEP BOILER TUBES CLEAN $5,210 $1,534 Implemented